Hi Guys,

I have a customer with a monthly backup job that runs on the last day of each month

Looking at this I can see that the repository does not have enough room for this months backup job that will run on the 31st January.

If i delete an incremental the job will fail right?

The job is a reverse incremental. What options do I have to get this job to work?

Each vrb is 180GB and there is only roughly 90GB left free on the partition

Thanks
foggy
Veeam Software
Posts: 21138
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Monthly Backup Job

Post by foggy »

Fintan, in case of reverse incremental chain, you can remove the oldest incremental file manually, if required. The job will not fail, however the corresponding restore point will still be displayed in the Veeam B&R UI and then removed, when retention comes.