What happens if during backup copy job primary backup starts

Post by complexxL9 »

So as the title asks what would happen if during backup copy job which is currently in progress, suddenly the primary backup job would start according to it's schedule? Would that interrupt the backup copy? Should I plan accordingly so backup copy always have time to finish before next primary backup job (for same VM) runs?
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: What happens if during backup copy job primary backup st

Post by Shestakov »

Hello Aurimas,
complexxL9 wrote:So as the title asks what would happen if during backup copy job which is currently in progress, suddenly the primary backup job would start according to it's schedule? Would that interrupt the backup copy?
No, backup copy job will not be interrupted.
Backup copy job has several phases. As mentioned in the user guide,
the synchronization phase starts according to the predefinted time interval. At the beginning of a new interval, Veeam Backup & Replication checks if a new restore point is available on the source backup repository. And if a new restore point is found, the backup copy job starts the synchronization process and copies the latest VM restore point from the source backup repository to the target backup repository. In a case new restore point appears during the next phases(transform, post-job activities), the backup copy job process will be still finished.

So, yes, you should plan your jobs` schedule keeping in mind their durations.
Thanks!
Vitaliy S.
VP, Product Management
Posts: 27112
Liked: 2719 times
Joined: Mar 30, 2009 9:13 am
Full Name: Vitaliy Safarov
Contact:

Re: What happens if during backup copy job primary backup st

Post by Vitaliy S. »

Actually backup copy job will be interrupted if it overlaps with the source backup job > Help with backup copy job (continuous)
Gostev
Chief Product Officer
Posts: 31521
Liked: 6699 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: What happens if during backup copy job primary backup st

Post by Gostev »

Interrupted in v7, suspended (paused) in v8.

From What's New document:
Backup Copy suspend: A Backup Copy job is now suspended when source backup files are locked by another job or process, such as a restore or full backup file transformation, instead of just failing.
complexxL9
Novice
Posts: 9
Liked: never
Joined: Oct 20, 2012 2:51 pm
Full Name: Aurimas Navardauskas
Contact:

Re: What happens if during backup copy job primary backup st

Post by complexxL9 »

Thank you for answers, however in my experience with v8 is that backup copy fails after trying to resume and in the result backup copy restore points are unusable.
The workaround I currently use is to disable copy job, remove copy backups from repository and enable copy job again, but this causes full backup copy over WAN and takes a long time, so I need to find some other solution to this problem.

Code: Select all

2015.03.17 17:23:37 :: Error: The process cannot access the file because it is being used by another process. Failed to create or open file [\\<ip>\veeam\Copy-RDS\Copy-RDS2015-03-17T070000.vib]. Failed to download disk. End of file Failed to upload disk. Agent failed to process method {DataTransfer.SyncDisk}.
case ID 00834070.
kubimike
Veteran
Posts: 373
Liked: 41 times
Joined: Feb 03, 2017 2:34 pm
Full Name: MikeO
Contact:

[MERGED] Job Priority ?

Post by kubimike »

Hello, if a backup copy job is running, and it happens to come upon the primary job window will the backup copy job stop ? How would this play out?

Thanks
PTide
Product Manager
Posts: 6428
Liked: 729 times
Joined: May 19, 2015 1:46 pm
Contact:

Re: What happens if during backup copy job primary backup st

Post by PTide »

Hi,

Primary backup job has a priority over backup copy job, so if an overlap somehow occurs then some the tasks that require backup copy job to lock backup files will be placed on hold until the primary job is done using the files. Please check this article for more details.

Thanks