Comprehensive data protection for all workloads
Post Reply
Tarqy
Service Provider
Posts: 42
Liked: 5 times
Joined: Aug 08, 2014 1:51 pm
Full Name: Barry Knox
Contact:

ad hoc full compact of backup copy job

Post by Tarqy »

Other than modifying the schedule for full compact on a backup copy job is there a way to run an ad hoc compact via the CLI?
VMCE
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: ad hoc full compact of backup copy job

Post by Shestakov »

Hello, Barry
Yes, you can automate it. Please review this topic.
Thanks!
Tarqy
Service Provider
Posts: 42
Liked: 5 times
Joined: Aug 08, 2014 1:51 pm
Full Name: Barry Knox
Contact:

Re: ad hoc full compact of backup copy job

Post by Tarqy »

I'm not sure that answers the question, I'm running continuous backup copy jobs with a scheduled compact for each job but I want to be able to run a compact on an ad-hoc basis without the system sending me lots of emails when I disable the copy job to amend the schedule.
VMCE
veremin
Product Manager
Posts: 20413
Liked: 2301 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: ad hoc full compact of backup copy job

Post by veremin »

Most of backup copy job settings are configurable via Powershell. Compact full schedule should be configurable there, as well. The idea will be to disable compact full in GUI, then, execute the PS script. Within the script the backup copy job will be disabled, compact full will be enabled, the current date will be setup as its schedule, and the backup copy job will re-enabled again (which supposedly should result in its new cycle; otherwise, you might want to leverage sync now option). Thanks.
Gostev
Chief Product Officer
Posts: 31812
Liked: 7302 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: ad hoc full compact of backup copy job

Post by Gostev »

I am not sure I follow you here, Vladimir. I think the real answer is - there is no way to trigger ad hoc compact operation via CLI.
veremin
Product Manager
Posts: 20413
Liked: 2301 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: ad hoc full compact of backup copy job

Post by veremin »

The idea is to set within the script current date as a date when compact full backup should take place and force next cycle of backup copy job during which compact full would be created. But that speculation needs to be proved, of course.
Post Reply

Who is online

Users browsing this forum: nathang_pid and 127 guests