Hoping someone can assist - I've had this case open with support for almost a month. I've uploaded multiple log bundles, we've done webex sessions, and nothing yet is a smoking gun why these jobs fail. It should be known that other jobs on the Veeam server are running successfully. DR jobs are working too. I've left Backup Job1 running and it is sitting at 161 hours run time currently with 0% processed.
Backup Job1 - 3VMs - yes use storage integration w netapp, no do not fail over to network backups, yes use application aware processing, no do not index guest file system
VM1 - MS SQL server
VM2 - MS App server
VM3 - MS App server
If I create three new backup jobs they work because I did not choose to use application aware processing and yes use storage snapshots.
VM1-Backup - ran this job 100% successful with no checks for application aware processing or indexing.
VM2-Backup - ran this job 100% successful with no checks for application aware processing or indexing.
VM3-Backup - ran this job 100% successful with no checks for application aware processing or indexing.
If I change the individual backup jobs to use application aware processing things fail:
VM1-Backup - job hangs at 0% with this entry: 5/1/2015 2:59:31 PM :: Inventorying guest system. In order to stop this job I have to kill the Veeam processes in Task Manager.
VM2-Backup - Job fails with "Failed to prepare guest for hot backup. VSSControl: Freeze state is none."
VM3-Backup - Job fails with "Failed to prepare guest for hot backup. VSSControl: Freeze state is none."
Here is the output of statistics for VM2-Backup
Code: Select all
5/1/2015 3:21:50 PM :: Job started at 5/1/2015 3:21:48 PM
5/1/2015 3:21:50 PM :: Building VM list
5/1/2015 3:22:11 PM :: VM size: 460.0 GB (64.8 GB used)
5/1/2015 3:22:11 PM :: Changed block tracking is enabled
5/1/2015 3:22:15 PM :: Queued for processing at 5/1/2015 3:22:15 PM
5/1/2015 3:22:15 PM :: Required backup infrastructure resources have been assigned
5/1/2015 3:22:15 PM :: Preparing next VM for processing
5/1/2015 3:22:38 PM :: Creating storage snapshot
5/1/2015 3:22:48 PM :: Preparing next VM for processing
5/1/2015 3:22:53 PM :: All VMs have been queued for processing
5/1/2015 3:22:53 PM :: Processing VM2 Error: Failed to prepare VM for processing.
5/1/2015 3:23:01 PM :: Deleting storage snapshot
5/1/2015 3:24:02 PM :: Job finished with error at 5/1/2015 3:24:02 PM
Statistics for VM3-Backup
5/1/2015 3:22:18 PM :: VMware Tools are not up to date, some functionality
may be affected (this only shows on one of the jobs)
5/1/2015 3:22:23 PM :: Inventorying guest system
5/1/2015 3:22:30 PM :: Failed to prepare guest for hot backup. Error: VSSControl: Freeze state is none
5/1/2015 3:22:48 PM :: Queued for processing at 5/1/2015 3:22:48 PM
5/1/2015 3:22:48 PM :: Required backup infrastructure resources have been assigned
5/1/2015 3:22:53 PM :: VM processing started at 5/1/2015 3:22:53 PM
5/1/2015 3:22:53 PM :: VM size: 460.0 GB (64.8 GB used)
5/1/2015 3:22:55 PM :: Error: Failed to prepare VM for processing.
5/1/2015 3:22:55 PM :: Network traffic verification detected no corrupted blocks
5/1/2015 3:22:55 PM :: Processing finished with errors at 5/1/2015 3:22:55PM