-
- Enthusiast
- Posts: 66
- Liked: 1 time
- Joined: Aug 18, 2014 6:06 pm
- Contact:
Manual job chain execution
I've updated to 8.0 2b and have some backup to disk jobs that have backup to tape jobs chained to them and they're scheduled to start after the source job is finished. However, if i start the source job manually, I don't get the choice to start that single job or the entire chain. Isn't this supposed to be one of the changes in 2b? Thanks.
-
- Chief Product Officer
- Posts: 31459
- Liked: 6648 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Manual job chain execution
Yes, currently it's by design with tape jobs, because supporting these required more code changes than we were ready to make in an update. This should still be addressed down the road though. Thanks!
-
- Enthusiast
- Posts: 66
- Liked: 1 time
- Joined: Aug 18, 2014 6:06 pm
- Contact:
Re: Manual job chain execution
Great, thanks for clarifying.
Who is online
Users browsing this forum: Google [Bot] and 235 guests