Host-based backup of VMware vSphere VMs.
Post Reply
cffit
Veteran
Posts: 338
Liked: 35 times
Joined: Jan 20, 2012 2:36 pm
Full Name: Christensen Farms
Contact:

Link Backup Copy jobs to follow corresponding Backup jobs

Post by cffit »

I have backup copy jobs that are based off actual backup jobs. Is there a way to have the backup copy job automatically kick-off after the corresponding backup job finishes?

The problem is that on the weekdays the incremental backup jobs run in a short time, and on the weekend the full backup jobs take much, much longer. So setting a time for the backup copy job to run that follows the backup job is not possible given the weekend backups take longer and VEEAM does not allow in the GUI to schedule backups to have different schedules for weekends vs weekdays (which is what I really want). I know the scheduling can be done with powershell, but I don't like having to go that route.
foggy
Veeam Software
Posts: 21071
Liked: 2115 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Link Backup Copy jobs to follow corresponding Backup job

Post by foggy »

Set the backup copy job copy interval to start 5 minutes after the source backup job is scheduled to start. This way backup copy will sit and wait until new restore points are created and will start copying data once they appear.
Post Reply

Who is online

Users browsing this forum: No registered users and 52 guests