Hi,
some of the backup jobs of my customer are scheduled via Windows Task Scheduler because the schedule he wants is not handled by Veeam.

That jobs have dependent backup jobs.

If I run the first job using the command line provided at the end of the wizard the job starts, but when it finishes the dependent job does not start.

Is there a command line option to tell Veeam to run child jobs?

Veeam is 9.0.0.902 running on a Windows 2008 R2.

Thanks!

ciao,
luigi
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: Dependent jobs scheduled via Windows Scheduler

Post by Shestakov »

Hi Luigi,
Could you provide the use case why your client is not satisfied with native Veeam schedule?
lrosa wrote:Is there a command line option to tell Veeam to run child jobs?
It may be accomplished by post-job activity.
By the way, job chaining is not considered as the best practice. We recommend to run jobs in parallel.
Thanks!
lrosa
Influencer
Posts: 17
Liked: 3 times
Joined: Dec 11, 2012 9:11 pm
Full Name: Luigi Rosa
Location: Italy
Contact:

Re: Dependent jobs scheduled via Windows Scheduler

Post by lrosa »

Thank you for your answer.

My customer wants to make a weekly backup on two targets on 1st, 3rd [5th] weekend and to other different targets on 2nd, 4th weekend in order to balance the backups and increase retention (the same strategies is applied to even/odd weekdays and even/odd months). In Windows Scheduler there is such option.

I will try do do simultaneous jobs, thank you!

ciao,
luigi
veremin
Product Manager
Posts: 20284
Liked: 2258 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Dependent jobs scheduled via Windows Scheduler

Post by veremin »

Since customer wants to leverage several targets, wouldn't it be better to use combination of backup and backup copy jobs? The former writes to some primary location, while the former takes case about secondary destination. Thanks.
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: Dependent jobs scheduled via Windows Scheduler

Post by Shestakov »

By the way, starting from v9 there is new Scale out backup repository feature which let you combine repositories into one logical repo.