Is it possible to run a standard backup job for a VM and at the same time run a Replication job?
The backup will be written to local SAN and the replicated VM to remote storage. Ideally whilst the backup is being undertaken a replica is being updated as part of the same job at the same time. This will avoid extending the time of the backup followed by a replication (i.e. running the jobs sequentially).
I realise that essentially these are two independent processes but can they be part of a single Veeam backup/replication job? Or would this create high processing demands on the Veeam server or ESX host? We'll ignore the data transfer traffic for now!
Thanks.
			
			
									
						
										
						- 
				cby
 - Enthusiast
 - Posts: 97
 - Liked: 6 times
 - Joined: Feb 24, 2009 5:02 pm
 - Contact:
 
- 
				Gostev
 - Chief Product Officer
 - Posts: 32792
 - Liked: 7994 times
 - Joined: Jan 01, 2006 1:01 am
 - Location: Baar, Switzerland
 - Contact:
 
Re: Running concurrent Backup and Replication as a single jo
Hello, no we do not provide such capability in the product.
			
			
									
						
										