Hi,
i would like to request the following options for future releases:
- scheduling backup jobs and maintenance should have to the option to run on odd or even weeks.
- when scheduling a job which runs after another job there should be an option to combine this with selected days
Besides this, great Software
Greetings
mirs
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Oct 27, 2016 8:20 am
- Contact:
-
- Product Manager
- Posts: 8044
- Liked: 1263 times
- Joined: Feb 08, 2013 3:08 pm
- Full Name: Mike Resseler
- Location: Belgium
- Contact:
Re: Feature Request: schedule for odd and even weeks and mor
Hi Mirco,
Is there a special reason why you would want to run it only on odd or even weeks? Trying to think of a scenario where this would come in handy but seem to fail (I should get more coffee I guess )
Thanks
Mike
Is there a special reason why you would want to run it only on odd or even weeks? Trying to think of a scenario where this would come in handy but seem to fail (I should get more coffee I guess )
Thanks
Mike
-
- VP, Product Management
- Posts: 27055
- Liked: 2710 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: Feature Request: schedule for odd and even weeks and mor
If there is a missing option in our built-in scheduler, you can always try to use Windows Task Scheduler to launch the jobs, but I also would like to hear the scenario you're after. Thanks!
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Oct 27, 2016 8:20 am
- Contact:
Re: Feature Request: schedule for odd and even weeks and mor
Hello guys,
my customer has a main site with two esx machines and a third physical for veeam. In another small Office he got a single esx machine which gets backed up by the main veeam machine over two proxys at the office. One proxy runs on a virtual machine and the other one on an "always on" pc. He wants two separate backup repositorys at this site because of the cheaper hardware solution, one runs on even weeks and the other one on odd weeks. At the moment you have to enable and disable the two jobs once a week.
Having this option from the inside scheduler would be much more appreciated than handling with an outside dependency.
I guess the other request is a little bit more obvious?
Greetings
Mirco
my customer has a main site with two esx machines and a third physical for veeam. In another small Office he got a single esx machine which gets backed up by the main veeam machine over two proxys at the office. One proxy runs on a virtual machine and the other one on an "always on" pc. He wants two separate backup repositorys at this site because of the cheaper hardware solution, one runs on even weeks and the other one on odd weeks. At the moment you have to enable and disable the two jobs once a week.
Having this option from the inside scheduler would be much more appreciated than handling with an outside dependency.
I guess the other request is a little bit more obvious?
Greetings
Mirco
-
- VP, Product Management
- Posts: 27055
- Liked: 2710 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: Feature Request: schedule for odd and even weeks and mor
Ok, thanks for clarification, it seems like PowerShell script (to start a backup job), should help in this situation.