Comprehensive data protection for all workloads
Post Reply
Skullblade
Lurker
Posts: 1
Liked: never
Joined: Apr 27, 2017 4:10 pm
Full Name: Matteo Aprile
Contact:

Weekly Copy Jobs

Post by Skullblade »

Hi to everyone,
i have a customer, that want to do a backup copy on a RDX once a week. He want insert rdx monday morning and do a copy of last backup for offsite copy.
Is correct create Copy job set with interval of 7 days and start time at 9:00 and start it manually for the first time on monday morning?
Is possible to set the begin of first copy or schedule it with a powershell script?
Futhermore RDX cartridge is 1TB and backup size is 800GB so is better clear the backup folder with pre-script or set force delete backup on registry?
Thanks for help
DGrinev
Veteran
Posts: 1943
Liked: 247 times
Joined: Dec 01, 2016 3:49 pm
Full Name: Dmitry Grinev
Location: St.Petersburg
Contact:

Re: Weekly Copy Jobs

Post by DGrinev »

Hi Matteo and welcome to the community!

Do not forget to enable rotated drives on the repository.
Skullblade wrote:Is correct create Copy job set with interval of 7 days and start time at 9:00 and start it manually for the first time on monday morning?
Yes, that's correct. The new interval cycle should start right after you switch RDX.
Also, review this thread with a similar approach for RDX Drives.
Skullblade wrote:Futhermore RDX cartridge is 1TB and backup size is 800GB so is better clear the backup folder with pre-script or set force delete backup on registry?
You can perform cleanup of existing backup files prior each cycle, using the ForceDeleteBackupFiles registry key.

Thanks!
Post Reply

Who is online

Users browsing this forum: acatic1 and 158 guests