I have a Copy job that I want to use to create copies for long term. I have it set to run each 31 days. I want to keep 6 months (or be able to go back 6 months). And I want one backup each year, for 5 years.
Like this
But what do I set the restore point to ?
Do I need to caculate for the 5 years total ? (meaning 5 times 1, plus 6 months, = 11 ? )
Or is the restore point count totally seperate from the rest ? Do I then need to set it to 1 ? Or whatever else I want ?
This is also not easy to test and see what happens. I would need to wait at least 1 month to see the result.