I need to use backup to tape for one customer and I have some question to be sure I understand it correctly.
The need :
(1)Backup all the data from all the job (except job dedicated for VM VBM 365 all in one) with this retention : 7d/4w/12m/5y
(2)Backup all the data from VBM 365 job with retention 12m (no daily backup, no weekly, no yearly)
What I create :
for (1) 1 GFS media pool with these settings


for (2) and for the M365 I use these settings (no parallel processing enable to not write on 2 media)


Then I create a backup to tape job
for (1)
I target media pool for (1)



for (2)
the same but target media pool for (2) and GFS scan at 5h and monthly the 1day of the month.
I configure these settings last week and I have different questions :
1) Every incremental use 2 tapes whereas I have enough space on 1 -> I suppose it's because I enable parallel processing and check "enable parallel processing of backup chains within a single tape job"?
Is there a way to use parallel processing only for weekly / monthly / yearly without create other backup to tape job ?
2) The same tape can be used to backup monday and thuesday data. -> Is it because I need to uncjeck this checkbox

3) First weekly happend during last weekend and it used 4 tapes whereas there is space left on first 2. Here I really ignore what happened

Thanks a lot for your answer