Once the 6th backup finishes, it runs the next 6 . This has increased my backup window.
I've tried modifying the order of jobs hoping if I ran the largest jobs first it would keep the drives running longer and speed things up, but didn't help.
Any idea what would cause this, or what logs I should check? I Can create a ticket if needed, but figured I could dive a bit deeper on my own first. That middle portion is such a waste of time having idle drives.
