Comprehensive data protection for all workloads
Post Reply
rrkerr
Influencer
Posts: 22
Liked: never
Joined: Mar 17, 2010 10:16 am
Full Name: Ryan
Contact:

Reverse incr stratedgy

Post by rrkerr »

Hi all, I'm looking for some clarification on how many .vbk files I should have given the following backup job configuration with v6 patch3. I thought with reverse incremental I'd only ever have one .vbk file but that doesn't seem to be the case.

Reverse incremental scheduled for Mon, Tue, Wed, Thur, Fri (The schedule is set to week-days only)
On the same screen, Active Full is also enabled by default, scheduled weekly on a Sunday.
Restore points kept is default (7)

The first backup was performed on the Monday, that day I have a full backup - correct?
Thereafter (Tue-Fri) the backups are incremental only, with the incremental changes then rolled up into the vbk file; so the vbk is modified each day and the previous days backups appear as .vrb files with just that days changed data - is this correct?
On the Sunday when the active full is scheduled, does this create a new backup chain, in addition to the one started the previous Monday; therefore I will now have 2 .vbk files? This is what seems to be happening.
If yes, does this mean that the next day (Mon), when that backup runs is the incremental backup based on the Friday vbk or the Sunday vbk?

I actually thought running a periodic active full on the Sunday "refreshed" the most recent vbk file created on the Friday and replaced it space for one vbk but maybe not.

Thanks in advance.
foggy
Veeam Software
Posts: 21069
Liked: 2115 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Reverse incr stratedgy

Post by foggy »

Ryan, everything is correct. With active full enabled and given your scheduling and retention settings, you will always have two vbk files in place. Active full resets the current backup chain and starts it anew keeping previous restore points according to retention settings. Your Monday incremental will be based on the Sunday active full.
dellock6
Veeam Software
Posts: 6137
Liked: 1928 times
Joined: Jul 26, 2009 3:39 pm
Full Name: Luca Dell'Oca
Location: Varese, Italy
Contact:

Re: Reverse incr stratedgy

Post by dellock6 »

On additional note, active full create no duplicate only if it is scheduled the same day of the "standard" full.

Luca.
Luca Dell'Oca
Principal EMEA Cloud Architect @ Veeam Software

@dellock6
https://www.virtualtothecore.com/
vExpert 2011 -> 2022
Veeam VMCE #1
JoshRountree
Enthusiast
Posts: 34
Liked: 2 times
Joined: Feb 23, 2012 5:49 pm
Full Name: Josh Rountree
Contact:

[MERGED] Reverse Incremental with Active Fulls - Twice the s

Post by JoshRountree »

If I have the Active Full option checked, will the active full replace the reverse incremental full, or will I have 2 fulls sitting out there?

If the active full replaces the reverse incremental full do I need twice the space to do this, or can Veeam replace the Reverse Incremental full with the active full as it does it? Do I need twice the space of a full backup in order for Veeam to complete the active full?
Gostev
Chief Product Officer
Posts: 31460
Liked: 6648 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: Reverse incr stratedgy

Post by Gostev »

2 fulls. Active Full starts new backup file chain, so twice the space.
JoshRountree
Enthusiast
Posts: 34
Liked: 2 times
Joined: Feb 23, 2012 5:49 pm
Full Name: Josh Rountree
Contact:

Re: Reverse incr stratedgy

Post by JoshRountree »

Does Veeam, the company, do active fulls as part of their backup policies?
Gostev
Chief Product Officer
Posts: 31460
Liked: 6648 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: Reverse incr stratedgy

Post by Gostev »

No, we ourselves do not have active fulls scheduled. By the way, active fulls were added as a feature only in v4 - when we started using our product since v1.

However, active fulls do happen once every half-year or so anyway - due to various changes in virtual, storage or backup infrastructures. Or, they would be triggered manually by admins sometimes, with the purpose of shrinking VBK file after major job reconfiguration.
JoshRountree
Enthusiast
Posts: 34
Liked: 2 times
Joined: Feb 23, 2012 5:49 pm
Full Name: Josh Rountree
Contact:

Re: Reverse incr stratedgy

Post by JoshRountree »

Good, that's the answer I wanted to hear!

One more question regarding Synthetic fulls and transforms. Let's pretend I save 14 restore points, forward incremental, synthetic full on Saturday, and the transform option checked (so as to save only one full).

Once things get rolling how will things look on Friday? Will I have a synthetic full from last Saturday, forward incrementals from then on, but days older than Saturday will those be reverse incrementals *.vbr ?
foggy
Veeam Software
Posts: 21069
Liked: 2115 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Reverse incr stratedgy

Post by foggy »

JoshRountree wrote:Once things get rolling how will things look on Friday? Will I have a synthetic full from last Saturday, forward incrementals from then on, but days older than Saturday will those be reverse incrementals *.vbr ?
Correct. Btw, this is clearly illustrated in the user guide.
Post Reply

Who is online

Users browsing this forum: Bing [Bot], Semrush [Bot] and 181 guests