During our periodical DR recovery test, I noticed a time-consuming quirk on the tape recovery UI. When I had made a selection of VMs to recover to staging disk, I could not mass-select them and choose the "Point in Time" button for all VMs - it was greyed out:
Only when a single VM is selected, the point-in-time button becomes available and the desired date can be selected. However, this needs to be repeated for each VM.
Does anyone know if this is by design? We have prioritized our servers, and in a DR situation (or specific tape set test) we want to recover our critical servers first, from whichever date. Selecting them in the restore wizard (about 100 VMs) means a hundred times clicking the 'point in time' button and going through the list. It would be great if I can just select them all, and choose point-in-time once.
Could be I'm missing something, in which case I'd love to hear it as well.
