Good Day
On a remote site we have 2 physical servers. we want to move away from Backup Exec. I thought about install VAW Server Edition on both systems and backup them to a NAS share. That is no problem. Now i like to offload the latest full backup every weekend to a usb drive so that they can be taken off site.
1. I could configure the nas to offload the vbk file, but as VAW uses forward incremental, the vbk file has not the latest data stored. -> is thare any way to configure VAW to use reverse incremental backup?
2. i could configure the nas as a backup repository in our central veeam environment and configure the two vaw to backup to the repsoitory. then i could configure a backup copy job to a usb drive connected to one of the two servers. is there any way i could configure the backup copy job to do a "synthetic" full backup to this usb drive? and if yes, does veeam recoginzed the rotated usb drives?
Or is there any other way to offload the latest backup point to usb? i don't want to offload the whole backup chain (full and increment) to usb. the plan is to hold as much retention point on the nas as possible.
Thanks
best regards
andré
-
- Veteran
- Posts: 389
- Liked: 54 times
- Joined: Sep 05, 2011 1:31 pm
- Full Name: Andre
- Contact:
-
- Product Manager
- Posts: 14726
- Liked: 1706 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: VAW offload full backup
Hello André,
Unfortunately VAW does not support reversed incremental backup mode.is thare any way to configure VAW to use reverse incremental backup?
I believe Backup Copy from NAS repository (added to VBR console) to a repository with Rotated Drive option enabled is a solution.is there any way i could configure the backup copy job to do a "synthetic" full backup to this usb drive? and if yes, does veeam recoginzed the rotated usb drives?
Who is online