Incremental backups currently use one thread per SharePoint List. This needs to be rewritten to use all threads available on the proxy.
For us this causes MUCH worse problems than throttling. This is not a configuration issue, this is a code design improvement. Without this VBO cannot possibly scale to meet our requirements where SharePoint is being used for file storage, which is a common scenario.
As currently written, even a small tenant can move some files around and cause their backup to instead of completing in 20 mins as normal - instead it will fail to backup within 20 days.
See post431405.html , support case 05013518 and support case 05139337 for more details.
Edit: corrected to refer to SP Lists, not SP sites which do use multiple threads.
-
- Veteran
- Posts: 563
- Liked: 173 times
- Joined: Nov 15, 2019 4:09 pm
- Full Name: Alex Heylin
- Contact:
-
- Enthusiast
- Posts: 32
- Liked: 12 times
- Joined: Jan 08, 2021 5:05 pm
- Full Name: Alan Rogers
- Contact:
Re: ENHANCEMENT REQUEST - SharePoint Lists NEED multithreaded backup
I would also like to highly encourage better thread usage. Multi TB Sharepoint sites are very common for customers and Veeam has to be better at these heavy Sharepoint workloads.
-
- Product Manager
- Posts: 8191
- Liked: 1322 times
- Joined: Feb 08, 2013 3:08 pm
- Full Name: Mike Resseler
- Location: Belgium
- Contact:
Re: ENHANCEMENT REQUEST - SharePoint Lists NEED multithreaded backup
Hi all,
This feature request is already noted and on our list of items to do. I cannot give any ETA for the moment, but it will get into the product
This feature request is already noted and on our list of items to do. I cannot give any ETA for the moment, but it will get into the product
-
- Veteran
- Posts: 563
- Liked: 173 times
- Joined: Nov 15, 2019 4:09 pm
- Full Name: Alex Heylin
- Contact:
Who is online
Users browsing this forum: No registered users and 15 guests