Hi there,
I have a Backup Copy Job with the following setting:
- Copy every 8 Days 09.00
- Target (Weekly Backup, 4 (Monday), Monthly 2)
- Data Transfer = direct
- Schedule any time
If i look at the Copy Report - it always Copies on Sunday instead of Monday.
Why is this?
Kind regards, Adrian
I have a Backup Copy Job with the following setting:
- Copy every 8 Days 09.00
- Target (Weekly Backup, 4 (Monday), Monthly 2)
- Data Transfer = direct
- Schedule any time
If i look at the Copy Report - it always Copies on Sunday instead of Monday.
Why is this?
Kind regards, Adrian
-
- Veteran
- Posts: 1943
- Liked: 247 times
- Joined: Dec 01, 2016 3:49 pm
- Full Name: Dmitry Grinev
- Location: St.Petersburg
- Contact:
Re: Backup Copy Job - Scheduling
Hi Adrian,
Can you provide a bit more information:
1. What value you've set in a simple retention of backup copy job?
2. Which method have you selected for full backup creation Synthetic or Active Full?
3. What's the goal you're trying to achieve?
Can you provide a bit more information:
1. What value you've set in a simple retention of backup copy job?
2. Which method have you selected for full backup creation Synthetic or Active Full?
3. What's the goal you're trying to achieve?
-
- Influencer
- Posts: 24
- Liked: never
- Joined: Aug 08, 2018 7:41 am
- Full Name: adrian reinhard
- Contact:
Re: Backup Copy Job - Scheduling
Hi,
1. Retention is:
- Weekly 4 (Monday)
- Monthly 2
2. Create Synthetic Full Backups - Saturday
2. Active Full Monthly Last Saturday
3. The Backupjob should be gone through on Monday so i can write it down to tape on Tuesday
Thanks alot!
1. Retention is:
- Weekly 4 (Monday)
- Monthly 2
2. Create Synthetic Full Backups - Saturday
2. Active Full Monthly Last Saturday
3. The Backupjob should be gone through on Monday so i can write it down to tape on Tuesday
Thanks alot!
-
- Veteran
- Posts: 1943
- Liked: 247 times
- Joined: Dec 01, 2016 3:49 pm
- Full Name: Dmitry Grinev
- Location: St.Petersburg
- Contact:
Re: Backup Copy Job - Scheduling
Sorry, maybe I wasn't clear enough in my questions.
1. I would like to know how many restore points to keep, you've set for the backup copy job in the Target menu here.
2. The method for GFS restore point creation depends on the check-box called "Read the entire restore point from source instead of synthesizing it from increments" in the Target menu.
Also, can you provide details of the source backup job (schedule, restore points to keep). Thanks!
1. I would like to know how many restore points to keep, you've set for the backup copy job in the Target menu here.
2. The method for GFS restore point creation depends on the check-box called "Read the entire restore point from source instead of synthesizing it from increments" in the Target menu.
Also, can you provide details of the source backup job (schedule, restore points to keep). Thanks!
-
- Influencer
- Posts: 24
- Liked: never
- Joined: Aug 08, 2018 7:41 am
- Full Name: adrian reinhard
- Contact:
-
- Veteran
- Posts: 1943
- Liked: 247 times
- Joined: Dec 01, 2016 3:49 pm
- Full Name: Dmitry Grinev
- Location: St.Petersburg
- Contact:
Re: Backup Copy Job - Scheduling
You can set interval to 7 days and start the backup copy job on Monday (or click Sync Now on Monday after settings were changed).
Restore points to keep should be 2 to speed up GFS restore point creation starting from week 3 (since those RPs will be produced after the injection of increment into full backup file).
Restore points to keep should be 2 to speed up GFS restore point creation starting from week 3 (since those RPs will be produced after the injection of increment into full backup file).
-
- Influencer
- Posts: 24
- Liked: never
- Joined: Aug 08, 2018 7:41 am
- Full Name: adrian reinhard
- Contact:
Re: Backup Copy Job - Scheduling
Hi, thanks for your help.
i think my GFS Scheduling is wrong.
Why is my GFS not be done with the Backupcopyjob on Monday?
Its now creating a GFS Backup (Tuesday)..
Thanks alot, Adrian
Backupjob - Fileserver 6
- Retention 8
- Incremental (Synthetic Full Saturday), (Active Full Last Saturday)
Fullbackup created on Sat, 10.11.2018 (23:49 - 01.32), OK
Incrementalbackup created on Sunday, 11.11.2018 (21:51 - 22:26), OK
Backupcopyjob - Fileserver 6
- Copy every 8 days on 14:00
- Restorepoints 6
- Weekly Backup Monday
Sync Monday, 12.11. (14:41 - 18.23), OK
Manual Sync Tuesday, 13.11. (10:18) now with GFS
i think my GFS Scheduling is wrong.
Why is my GFS not be done with the Backupcopyjob on Monday?
Its now creating a GFS Backup (Tuesday)..
Thanks alot, Adrian
Backupjob - Fileserver 6
- Retention 8
- Incremental (Synthetic Full Saturday), (Active Full Last Saturday)
Fullbackup created on Sat, 10.11.2018 (23:49 - 01.32), OK
Incrementalbackup created on Sunday, 11.11.2018 (21:51 - 22:26), OK
Backupcopyjob - Fileserver 6
- Copy every 8 days on 14:00
- Restorepoints 6
- Weekly Backup Monday
Sync Monday, 12.11. (14:41 - 18.23), OK
Manual Sync Tuesday, 13.11. (10:18) now with GFS
-
- Veteran
- Posts: 1943
- Liked: 247 times
- Joined: Dec 01, 2016 3:49 pm
- Full Name: Dmitry Grinev
- Location: St.Petersburg
- Contact:
Re: Backup Copy Job - Scheduling
Hi Adrian,
Take a look at the KB here with animation for better understanding on how the GFS restore points creating.
Choosing day for GFS restore point doesn't mean it will be created on Friday, for example, it means that the desired state of machines in RP should be as close as possible to the Friday.
Plenty of useful information you can find in the big thread about GFS retention policy.
Do not hesitate to ask additional questions. Thanks!
Take a look at the KB here with animation for better understanding on how the GFS restore points creating.
Choosing day for GFS restore point doesn't mean it will be created on Friday, for example, it means that the desired state of machines in RP should be as close as possible to the Friday.
Plenty of useful information you can find in the big thread about GFS retention policy.
Do not hesitate to ask additional questions. Thanks!
-
- Influencer
- Posts: 24
- Liked: never
- Joined: Aug 08, 2018 7:41 am
- Full Name: adrian reinhard
- Contact:
Re: Backup Copy Job - Scheduling
Hi,
Thanks for your information.
I want to use Backupcopy to copy the latest Fullbackup to a Remotesite and write afterwards to tape.
So Backupcopy GFS is not really necessary, right?
Kind regards, Adrian
Thanks for your information.
I want to use Backupcopy to copy the latest Fullbackup to a Remotesite and write afterwards to tape.
So Backupcopy GFS is not really necessary, right?
Kind regards, Adrian
-
- Veteran
- Posts: 1943
- Liked: 247 times
- Joined: Dec 01, 2016 3:49 pm
- Full Name: Dmitry Grinev
- Location: St.Petersburg
- Contact:
Re: Backup Copy Job - Scheduling
You're right.
The major thing about the backup copy job is that it doesn't copy backups as most of people think at first, it creates a separate backup chain by using the data blocks from within source backup files.
The major thing about the backup copy job is that it doesn't copy backups as most of people think at first, it creates a separate backup chain by using the data blocks from within source backup files.
-
- Influencer
- Posts: 24
- Liked: never
- Joined: Aug 08, 2018 7:41 am
- Full Name: adrian reinhard
- Contact:
Re: Backup Copy Job - Scheduling
Last question:
My Goal would be this:
Whats the Best Practice with BackupCopy Job and GFS?
BackuptoDisk: everyday
Retention: as much as i can (faster restore)
BackupCopy: every week: sunday
Retention: ? (Best Practice?)
BackuptoTape: every week (Monday)
Thanks alot, Adrian
My Goal would be this:
Whats the Best Practice with BackupCopy Job and GFS?
BackuptoDisk: everyday
Retention: as much as i can (faster restore)
BackupCopy: every week: sunday
Retention: ? (Best Practice?)
BackuptoTape: every week (Monday)
Thanks alot, Adrian
-
- Veteran
- Posts: 1943
- Liked: 247 times
- Joined: Dec 01, 2016 3:49 pm
- Full Name: Dmitry Grinev
- Location: St.Petersburg
- Contact:
Re: Backup Copy Job - Scheduling
Hi,
The best practice is to have a separate backup chain in the offsite, thus the recommended approach is to set interval of BCJ to daily.
However, you can set the interval to 7 (start BCJ on Sunday) with the retention 2 (as I've mentioned in the post above, it allows to speed up GFS point creation). This way you will get the first GFS restore point on week 3 when the number of RPs will be exceeded. Thanks!
The best practice is to have a separate backup chain in the offsite, thus the recommended approach is to set interval of BCJ to daily.
However, you can set the interval to 7 (start BCJ on Sunday) with the retention 2 (as I've mentioned in the post above, it allows to speed up GFS point creation). This way you will get the first GFS restore point on week 3 when the number of RPs will be exceeded. Thanks!