Comprehensive data protection for all workloads
Post Reply
SamiE
Service Provider
Posts: 9
Liked: 2 times
Joined: Feb 11, 2020 11:13 am
Full Name: Sami Erjomaa
Contact:

Backup job maintenance tasks

Post by SamiE »

Hi,

Is there a way to run maintenance tasks like merge, compact, defragment, remove old items and health check on backup jobs without making a new increment?

Use cases:
re-run only merge if it has failed on last run.

compact backup files when obsolete VMs has been removed from the backup job
wishr
Veteran
Posts: 3077
Liked: 453 times
Joined: Aug 07, 2018 3:11 pm
Full Name: Fedor Maslov
Contact:

Re: Backup job maintenance tasks

Post by wishr »

Hi Sami,

Currently, all these operations are performed as a part of backup job runs and cannot be started manually and independently from the backup job runs. However, job retries and new job runs are two completely different logical operations. E.g. if the merge has failed, we will specifically retry the merge operation without starting the previous operations such as, for example, reading the data from the source.

Defragment and compact backup files operation removes obsolete VMs data from the backup files.

Thanks
Post Reply

Who is online

Users browsing this forum: Amazon [Bot], Google [Bot] and 122 guests