Since the job details don't actually show a time for this step, I've timed it and it takes slightly over 5 minutes to move from this step and actually start processing the VM's disk (see image below). Is this normal? Is there a way to speed this up?
Relevant information (I hope):
2 ESXi 5.5U2 hosts (both have local storage)
There is a VM installed on each host with Veeam proxy components (both are Windows 2012 R2)
Source proxy has 2 vCPUs and 6 GB of RAM
Target proxy has 2 vCPUs and 4GB of RAM
Parallel processing enabled, proxies limited to 2 tasks
Running Veeam 8.0.0.2030
Thoughts? Thanks!
