Comprehensive data protection for all workloads
Post Reply
fourg
Novice
Posts: 4
Liked: 1 time
Joined: Sep 16, 2015 10:11 pm
Full Name: Brent F
Contact:

Scheduled backup runs even though SDRS is migrating VM

Post by fourg »

We've hit an issue a few times with VMware where it's running a Storage DRS to balance our datastores and it may overlap with a daily scheduled Veeam backup. Veeam doesn't seem to recognize this and continues to attempt to run the backup job. Is there a way to prevent the job from running or just have it fail if a VM is in the middle of a live migration? While we aren't certain, it has appeared that both the SDRS and Veeam backup running at the same time causes major performance issues.

Thanks
Gostev
Chief Product Officer
Posts: 31804
Liked: 7298 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: Scheduled backup runs even though SDRS is migrating VM

Post by Gostev »

Hi, Brent. Have you thought about rescheduling Storage DRS to happen outside of your backup window? Thanks.
fourg
Novice
Posts: 4
Liked: 1 time
Joined: Sep 16, 2015 10:11 pm
Full Name: Brent F
Contact:

Re: Scheduled backup runs even though SDRS is migrating VM

Post by fourg »

Hi Gostev, no we had not been aware of the need to coordinate scheduling of SDRS and Veeam jobs, but it sounds like this is necessary based on your response.

Thanks
-Brent
veremin
Product Manager
Posts: 20400
Liked: 2298 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Scheduled backup runs even though SDRS is migrating VM

Post by veremin »

Being unaware of each other simultaneous run of both activities might lead to undesired consequences. Thus, the recommendations to execute them separately. Thanks.
fourg
Novice
Posts: 4
Liked: 1 time
Joined: Sep 16, 2015 10:11 pm
Full Name: Brent F
Contact:

Re: Scheduled backup runs even though SDRS is migrating VM

Post by fourg »

Definitely understood, but our challenge is that we have some VM's in the multiple TB's and a vMotion can take longer than 24 hours. The only workaround we can think of for those is to manually stop the daily backup in Veeam until the vmotion is completed. Not sure if it's possible, but maybe a usage case Veeam could consider for the future as storage/memory gets cheaper and VM's get much bigger. I'll admit I'm not exactly sure how SDRS handles an active vMotion which ends up still running outside of the scheduled SDRS window.
veremin
Product Manager
Posts: 20400
Liked: 2298 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Scheduled backup runs even though SDRS is migrating VM

Post by veremin »

May be a pre-job script that checks whether source VMs are being migrated at the moment and postpones a job in case of positive answer would do the trick for you? Thanks.
jameskilbynet
Enthusiast
Posts: 32
Liked: 7 times
Joined: Jan 14, 2015 11:18 am
Full Name: James Kilby
Contact:

Re: Scheduled backup runs even though SDRS is migrating VM

Post by jameskilbynet »

I think Vladimir suggestions makes the most sense. I have also seen storage migrations take over 24hr's especially going from one array to another where VAAI cant be leveraged
Post Reply

Who is online

Users browsing this forum: Bing [Bot], scottf99 and 111 guests