I have a backup job configured to start at 1800h. However this is a job that contains quite a number of systems and the backup itself runs until past midnight. When I was reviewing the log for the job it mentioned the below:
[11.11.2012 00:49:13] <01> Info [Transform] Checking the need of transformation...
[11.11.2012 00:49:15] <01> Info [Transform] Transformation is not needed.
I have 'Sunday' selected as my transform day and that is when the job started... but is it possible that because it ran until the Monday it is not detected as such?
Transform should start if it is set to run at the day when the job is started (job start time does matter here).
However, from the log I can see that the check for transform is performed on 11.11.2012 at 00:49:13, so possibly this is the Saturday's job run (not Sunday's, as you have specified) and transform should not start this time?