Hello all,
I'm having a problem with email notifications, we are currently in daylight saving time (DST) in our country.
Here what I got in my email report about a backup job:
With DST checked:
Start time 05:00:13
End time 06:03:51
Duration 1:03:37
With DST unchecked (I added manually 1 hour in time settings)
Start time 08:24:45
End time 08:28:07
Duration 0:03:22
Apparently, the End time doesn't take into consideration DST settings.
Is there any way to fix this?
Warm regards.
-
- Lurker
- Posts: 1
- Liked: never
- Joined: Sep 07, 2018 7:33 am
- Full Name: Soufiane Ben
- Contact:
-
- Veeam Software
- Posts: 21138
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Email notifications and DST
Hi Soufiane, this doesn't look expected, I will follow up with QA.
-
- Veeam Software
- Posts: 4
- Liked: never
- Joined: Jul 23, 2018 2:39 pm
- Full Name: Dmitry Kuznetsov
- Location: Saint-Petersburg, Russia
- Contact:
Re: Email notifications and DST
Hi, Soufiane!
I try to reproduce your case, but get correct timestamps in e-mail report from my VBR with DST enabled.
Can you add some details about your configuration? Such as:
- Installed VBR version.
- Which type of backup repository you use?
- Which time zone with DST you use?
- any other important config details from your case.
Thank you!
I try to reproduce your case, but get correct timestamps in e-mail report from my VBR with DST enabled.
Can you add some details about your configuration? Such as:
- Installed VBR version.
- Which type of backup repository you use?
- Which time zone with DST you use?
- any other important config details from your case.
Thank you!
Who is online
Users browsing this forum: Semrush [Bot] and 52 guests