Hello,
Could you advise on the best process to move away from a single console/management server, to having the management console located on a VM that connects back to the same server that has the data repository previously (which is physical and connected in Direct SAN mode)
Can we moved the SQL database and retain the jobs, and then simply reconfigure the targets/proxies thereafter?
Thank you
-
- Influencer
- Posts: 14
- Liked: never
- Joined: Nov 12, 2015 4:15 pm
- Contact:
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Redesign of infrastructure
Could you please clarify the entire redesign scenario, why do you need to move the SQL database? The basic scenario would be to upgrade the backup server to v9 and then just install remote console anywhere you need it.
Who is online
Users browsing this forum: Google [Bot] and 15 guests