I have introduced a number of backup copy jobs to replace other equivalent jobs. My problem is that given that the two will effectively have the same retention and backup the same VMs at the point I disable the previous job the retention will no longer be applied to the older RP's. So at some point I will start accumulating RP's that would have replaced those that were two years old.
I have been having a look at Powershell as a potential way to make this happen but I don't see a distinct way of enforcing retention without running a job which I don't want to do. Perhaps I have missed it. Furthermore given that some of the jobs that do different things (SQL, EXCH etc) all have different numbers of RP's there is something else to bear in mind. This is probably best enforced by date. But will this be doable through Veeam Powershell and what will the after effects be as far as Veeam Console is concerned (if its outside of Veeam will we have missing RP's displayed, if so does it matter)?
The primary concern is to automate this process given the different numbers of RP's the jobs have, that old jobs are disabled, and that it will be a pain for colleagues to keep track of.
Any thoughts (if I have managed to explain it clearly)?
Thanks in advance.
-
- Enthusiast
- Posts: 66
- Liked: 5 times
- Joined: Jan 30, 2018 12:06 pm
- Full Name: Simon Osborne
- Contact:
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Retention Puzzle
Hi Simon, the only way I see is to write a script that will delete restore points from disk outside Veeam B&R based on some acceptable criteria (after checking new backup chains, for example, or based on the new jobs success status). This will result in missing restore points in Veeam B&R UI, which can be addressed with the help of Forget functionality.
-
- Enthusiast
- Posts: 66
- Liked: 5 times
- Joined: Jan 30, 2018 12:06 pm
- Full Name: Simon Osborne
- Contact:
Re: Retention Puzzle
This command per repository will do the trick. And then once all the old RP's are phased out it can be disabled.
Get-ChildItem –Path "\\Server\drive$" -include "*.vbk", "*.vib" -Recurse | Where-Object {($_.LastWriteTime -lt (Get-Date).AddDays(-730))}
This Powershell line generates a list of target RP's a '| Remove-Item' will delete them. But I will make it a two step process which generates and e-mails a report with a separate script to do the dirty work if approved.
Get-ChildItem –Path "\\Server\drive$" -include "*.vbk", "*.vib" -Recurse | Where-Object {($_.LastWriteTime -lt (Get-Date).AddDays(-730))}
This Powershell line generates a list of target RP's a '| Remove-Item' will delete them. But I will make it a two step process which generates and e-mails a report with a separate script to do the dirty work if approved.
-
- Enthusiast
- Posts: 66
- Liked: 5 times
- Joined: Jan 30, 2018 12:06 pm
- Full Name: Simon Osborne
- Contact:
Re: Retention Puzzle
Code: Select all
#Variables for todays date, filename and path with timestamp, and the last date to be retained.
$CurrDate = (Get-Date -Format yyyyMMdd)
$LogFile = "c:\Temp\" + $CurrDate + "_Report.log"
$LastDate = (Get-Date).AddDays(-730)
#Command to list all files on UNC path(s) of extension .vbk or vib that are older than a target date, and to record that in a log file. Adding | Remove-Item also deletes those files.
Get-ChildItem -Path \\VEEAM-1\d$,\\VEEAM-2\d$ -include "*.vbk", "*.vib" -Recurse | Where-Object {($_.LastWriteTime -lt $LastDate)} >> $LogFile
#This emails the log file generated by the command above. The intention being that it is a two step process with a seperate script to delete the items after approval.
Send-MailMessage -from "veeam@domain.com" -to "me@domain.com" -subject "Monthly Veeam Retention Report (For Disabled Archive Jobs)" `
-body "Test retention report for backups older than a year." `
-Attachment $Logfile -smtpServer 1.2.3.4