Chain rollup for obsolete job [ID# 02430152]

Discussions specific to Microsoft Hyper-V hypervisor

Chain rollup for obsolete job [ID# 02430152]

Veeam Logoby Ant » Tue Dec 19, 2017 3:52 am

Hi, I want to gradually roll up the chain from an old job as it is replace with a new one. I haven't found anything specific for this in the forum, most articles are just how to reverse the chain method and associated problems. The TLDR is can I continue to run the standard daily scheduled job with no VM's, decrease the restore points configured in the job each day and have it gradually roll up the restore points or will this delete / corrupt the existing chain?

or, if you need more info:

Basically I have a single job which I am replacing with 5 more tailored jobs to suit each specific VM. I am decreasing my number of chained backups prior to starting the new ones, so I have enough space for a full backup on the new 5, but I need to keep the old backup restore points. My intention is to reduce the old backup to have one less restore point each day, until I have them all in the new backup jobs. I assume someone has come across this scenario before but I guess I have not used the force enough in my search queries. Perhaps there another way to do this?
Ant
Lurker
 
Posts: 1
Liked: never
Joined: Thu Dec 07, 2017 10:07 pm
Full Name: Anthony Richardson

Re: Chain rollup for obsolete job [ID# 02430152]

Veeam Logoby Andreas Neufert » Tue Dec 19, 2017 7:50 pm

Create a test job for this.
Exclude the same VMs that you have added to the Job.
I think it will lead to the result you try to achieve.
Andreas Neufert
Veeam Software
 
Posts: 2690
Liked: 456 times
Joined: Wed May 04, 2011 8:36 am
Location: Germany
Full Name: @AndyandtheVMs Veeam PM


Return to Microsoft Hyper-V



Who is online

Users browsing this forum: No registered users and 8 guests