Comprehensive data protection for all workloads
Post Reply
zleffa
Novice
Posts: 4
Liked: never
Joined: Nov 24, 2014 9:53 am
Full Name: Zleffa
Contact:

Archive design with DataDomain

Post by zleffa »

Hello everyone.
What is the best solution to achieve next

1. Backup Exchange every day to local repository
2. For last 10 days keep the backup on local repository for ability to do fast restore
3. Archive backup 90 days (every single day) to DataDomain

If I know Backup Copy Job use schema 1 full + incr, and there is limit for 60 incr in one backup chain.

Thank for advice

Zleffa
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Archive design with DataDomain

Post by veremin »

It's per job limitation. So, potentially you can have two backup jobs running on bimonthly basis with 45 point retention each.
zleffa
Novice
Posts: 4
Liked: never
Joined: Nov 24, 2014 9:53 am
Full Name: Zleffa
Contact:

Re: Archive design with DataDomain

Post by zleffa »

thx for response, but if I know there is no option run backup job every day in specific month
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Archive design with DataDomain

Post by veremin »

Create two backup copy jobs. Set daily copy interval for them and 45 as a number of restore points. Then, disable one of them, and let the other run for 45 days. On the 46th day, do the opposite (enable the first job, disable the second).

If should be possible to automate everything via PS, so that, manual efforts wouldn't be needed.

Thanks.
Post Reply

Who is online

Users browsing this forum: Bing [Bot], Semrush [Bot] and 204 guests