Feature Request: Add Holidays in Scheduling

Post by 20100 » 1 person likes this post

Hi

It would be good to have a special box to tick in the scheduling for "Enable Holidays", that way the schedule jobs do not run on specific days.
if ticked, Veeam could read a special "holidays" file that would contain a list of the holidays for the current year.
That file would be managed by the User with for example the day number (one per line for example).
The file could look like:
#Holidays for 2015
1 # New Year day
2 # Boxing day
93 # Easter Friday
96 # Easter Monday
etc

This would be particularly beneficial for tape backups and tape copies, when operators are not available to replace tapes, or when tape libraries do not have enough slots to fit several days of tapes.
This is not as crucial for backup to disks but there is still some benefits to have a single file that would be read by all jobs (if option "Enable Holidays" is ticked) in order to quickly alter the schedules for a one off operation (ie datacenter maintenance, planned WAN down time, office shutdown period, etc) without the need to go to each jobs and disable it or change the scheduling, and then to change again.

I am sure there might be some workaround to achieve the same thing by using Windows Scheduling,etc but it would be good to have everything managed through Veeam
Dima P.
Product Manager
Posts: 14726
Liked: 1707 times
Joined: Feb 04, 2013 2:07 pm
Full Name: Dmitry Popov
Location: Prague
Contact:

Re: Feature Request: Add Holidays in Scheduling

Post by Dima P. »

Hi 20100,
Good request indeed. Regarding tapes – we have a waiting for tape time for tape jobs set to 3 days (72 hours) specifically for the purpose you described.

As for PowerShell scripts here is a post with the example - it may help you to trigger the jobs via Task Scheduler based on your personal schedule.

Thanks again!
jazzoberoi
Enthusiast
Posts: 96
Liked: 24 times
Joined: Oct 08, 2014 9:07 am
Full Name: Jazz Oberoi
Contact:

Re: Feature Request: Add Holidays in Scheduling

Post by jazzoberoi »

+1 for this feature.. would certainly come in handy.

I was just trying to work out what backup jobs i'd have to pause over the long weekend that we have here in OZ. Having a holiday's schedule would be very nice indeed.
Vitaliy S.
VP, Product Management
Posts: 27377
Liked: 2802 times
Joined: Mar 30, 2009 9:13 am
Full Name: Vitaliy Safarov
Contact:

Re: Feature Request: Add Holidays in Scheduling

Post by Vitaliy S. »

On a side note, if nothing happens during holidays period, then incremental backup should not consume much space, right?