Host-based backup of VMware vSphere VMs.
Post Reply
SGSA
Influencer
Posts: 18
Liked: never
Joined: Jan 24, 2013 10:15 pm
Full Name: Asela De Costa
Contact:

Rolling back changes made by incomplete job run Error

Post by SGSA »

Hi All,
i got following error and cannot backup the servers?

Error: The process cannot access the file because it is being used by another process. Failed to open file [\\NAS01\VeeamProdBackup\ADS01\ADS012015-11-10T214555.vrb] in readonly mode.

As
PTide
Product Manager
Posts: 6551
Liked: 765 times
Joined: May 19, 2015 1:46 pm
Contact:

Re: Rolling back changes made by incomplete job run Error

Post by PTide »

Hi,

Please check if any other job/process uses the .vrb file. Also check if there is any antivirus running.

Thank you.
Vitaliy S.
VP, Product Management
Posts: 27377
Liked: 2802 times
Joined: Mar 30, 2009 9:13 am
Full Name: Vitaliy Safarov
Contact:

Re: Rolling back changes made by incomplete job run Error

Post by Vitaliy S. »

The subsequent job run should create a new valid restore point, so there is no need to rollback any changes.
alanbolte
Veteran
Posts: 635
Liked: 174 times
Joined: Jun 18, 2012 8:58 pm
Full Name: Alan Bolte
Contact:

Re: Rolling back changes made by incomplete job run Error

Post by alanbolte »

I don't understand what you mean by that Vitaliy - reverse incremental (you can tell it's that mode by the .vrb file) always rolls back changes to the full backup file after a failure. "Rolling back changes made by incomplete job run" is what you will see in the real-time statistics during this process. Perhaps you were thinking of forward incremental?

Pavel's right about the possibility of antivirus or similar conflict, but I also occasionally see a NAS decide to lock a file for no obvious reason and not let go until the NAS is fully powered off and back on again (I've even seen a soft reboot not fix it).

What is your support case number?
Vitaliy S.
VP, Product Management
Posts: 27377
Liked: 2802 times
Joined: Mar 30, 2009 9:13 am
Full Name: Vitaliy Safarov
Contact:

Re: Rolling back changes made by incomplete job run Error

Post by Vitaliy S. »

I meant to say there is no need to do anything manually, cause if you resolve the issue with a locked file and run a job, we will create a new valid restore point.
WRS2200
Enthusiast
Posts: 28
Liked: 3 times
Joined: Aug 06, 2015 8:21 pm
Full Name: Weston Strom
Contact:

Re: Rolling back changes made by incomplete job run Error

Post by WRS2200 »

I was getting the same error. The job would fail at rolling back changes made by incomplete job run. The only way I was able to get a successful backup was to remove all the old restore points, resyc respository, and start an active full. I did not try to power the NAS on and off. I will try this next time I see the error.
Post Reply

Who is online

Users browsing this forum: No registered users and 17 guests