Discussions related to exporting backups to tape and backing up directly to tape.
Post Reply
bcann
Novice
Posts: 6
Liked: never
Joined: Oct 30, 2015 3:28 am
Full Name: Brad Cann
Contact:

ability for EOM to override/stop Weekly

Post by bcann »

Gday All,

Give we run our EOM on the last Friday of the month it would be good if there was an option to override/stop the end of week job from running and "colliding" with the EOM automatically and without having to either script or disable the end of week job.
veremin
Product Manager
Posts: 20284
Liked: 2258 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: ability for EOM to override/stop Weekly

Post by veremin »

You appear to be after GFS type of retention. If so, why not to use one GFS tape job (introduced in version 9) instead of multiple ones orchestrated with scripts?

The GFS backup to tape job is intelligent enough to avoid the given collision.

Thanks.
nikpolini
Enthusiast
Posts: 33
Liked: 2 times
Joined: May 28, 2015 3:23 am
Contact:

Re: ability for EOM to override/stop Weekly

Post by nikpolini »

GFS does not allow multiple tape drives...
Post Reply

Who is online

Users browsing this forum: Semrush [Bot] and 19 guests