Limiting the Number Tasks isn't right working

Post by helly.wu »

Hi , All

Limiting the Number Tasks isn't right working .

For example : Limiting the Number of Concurrent Tasks was set 8 , but the backup process show only 4 VM Guest was backup .
The proxy server was set 8*2=16vCPU,and each VM guest have one Vmdk disk .

Why not 8 VM guest was backup at the same time ?
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Limiting the Number Tasks isn't right working

Post by veremin »

How many backup jobs have been started simultaneously? How many VMs do those jobs have? How many virtual disks combined? Also, what is maximum concurrent tasks number specified in the target repository settings? Thanks.
helly.wu
Veeam Software
Posts: 66
Liked: 1 time
Joined: Jun 30, 2016 12:55 am
Full Name: helly.wu
Contact:

Re: Limiting the Number Tasks isn't right working

Post by helly.wu »

Hi , Eremin
How many backup jobs have been started simultaneously?
only 1 backup policy .
How many VMs do those jobs have?
20 VMs .
How many virtual disks combined?
each VMs have 1 vdisk .
Also, what is maximum concurrent tasks number specified in the target repository settings?
set up 8

Thanks for your reply .
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Limiting the Number Tasks isn't right working

Post by veremin »

And what mode does the said proxy server use (Direct SAN/Direct NFS, Hot-Add, NDB)? Thanks.
helly.wu
Veeam Software
Posts: 66
Liked: 1 time
Joined: Jun 30, 2016 12:55 am
Full Name: helly.wu
Contact:

Re: Limiting the Number Tasks isn't right working

Post by helly.wu »

Hotadd
alanbolte
Veteran
Posts: 635
Liked: 174 times
Joined: Jun 18, 2012 8:58 pm
Full Name: Alan Bolte
Contact:

Re: Limiting the Number Tasks isn't right working

Post by alanbolte »

Are there any other configured limits, such as on the repository?

Are all these VMs on the same host or datastore?
helly.wu
Veeam Software
Posts: 66
Liked: 1 time
Joined: Jun 30, 2016 12:55 am
Full Name: helly.wu
Contact:

Re: Limiting the Number Tasks isn't right working

Post by helly.wu »

Repository was set limit 8 tasks .

And all the VMs on the same datastore but doesn't on the same host .

Thanks .
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Limiting the Number Tasks isn't right working

Post by veremin »

Is there a message similar to this one in job statistics? If so, play with the regkey mentioned there and see how it goes for you. Thanks.