Discussions related to exporting backups to tape and backing up directly to tape.
Post Reply
sfbi
Influencer
Posts: 15
Liked: 2 times
Joined: Jan 12, 2016 10:15 am
Full Name: SFBI
Contact:

Tape copy (weekly) from repository

Post by sfbi »

Hello,
I've a Job executed every day (1 day full + 6 incremental).
The repository retention is set to "2" (in this mode I have: 1 full + 6 inc + 1 full + 6 incr)
Every day, at the end of this job, the backup is write to tape (with a LTO library/jukebox) into a media pool

Now I need to export a copy of the last week (only 1 full + 6 inc), every week, to another media pool, but the tape job (Backup to tape) can be only:

- Backup jobs
or
- Backup Repositories

How I can do this?

Best Regards
McClane
Expert
Posts: 106
Liked: 11 times
Joined: Jun 20, 2009 12:47 pm
Contact:

Re: Tape copy (weekly) from repository

Post by McClane »

You can't copy from tape to tape. You need to make a second job with the original source jobs.
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Tape copy (weekly) from repository

Post by veremin »

Tape to tape copy is outside of tape functionality currently offered, so having two separate tape jobs is a way to go. Thanks.
Post Reply

Who is online

Users browsing this forum: No registered users and 19 guests