Hello,
I've a Job executed every day (1 day full + 6 incremental).
The repository retention is set to "2" (in this mode I have: 1 full + 6 inc + 1 full + 6 incr)
Every day, at the end of this job, the backup is write to tape (with a LTO library/jukebox) into a media pool
Now I need to export a copy of the last week (only 1 full + 6 inc), every week, to another media pool, but the tape job (Backup to tape) can be only:
- Backup jobs
or
- Backup Repositories
How I can do this?
Best Regards
-
- Influencer
- Posts: 15
- Liked: 2 times
- Joined: Jan 12, 2016 10:15 am
- Full Name: SFBI
- Contact:
-
- Expert
- Posts: 106
- Liked: 11 times
- Joined: Jun 20, 2009 12:47 pm
- Contact:
Re: Tape copy (weekly) from repository
You can't copy from tape to tape. You need to make a second job with the original source jobs.
-
- Product Manager
- Posts: 20415
- Liked: 2302 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Tape copy (weekly) from repository
Tape to tape copy is outside of tape functionality currently offered, so having two separate tape jobs is a way to go. Thanks.
Who is online
Users browsing this forum: No registered users and 4 guests