Comprehensive data protection for all workloads
Post Reply
omfk
Expert
Posts: 110
Liked: 9 times
Joined: Nov 30, 2016 9:48 pm
Full Name: Frank Knappe
Contact:

Job stucks at 99% completed

Post by omfk »

Hi,

one of my backups jobs is showing some unusual message:
It is shown as running in the Last 24 Hours section with the statement "99% completed" in the Status column.

In the job details however it states:
13.09.2017 12:25:20 :: Job finished at 13.09.2017 12:25:20

That was more than 8h ago and jobs which were schedules afterwards started.

Any explanation?

BR
Frank
omfk
Expert
Posts: 110
Liked: 9 times
Joined: Nov 30, 2016 9:48 pm
Full Name: Frank Knappe
Contact:

Re: Job stucks at 99% completed

Post by omfk »

I've just noticed something more strange.
The above statement is true, when I look at the Veeam console directly on the VBR server.

When I look at the Veeam console on my local laptop it show the above mentioned job as completed and also the jobs afterwards were performed.

I've made screen shots which I can provide if needed.
tdewin
Veeam Software
Posts: 1775
Liked: 646 times
Joined: Mar 02, 2012 1:40 pm
Full Name: Timothy Dewin
Contact:

Re: Job stucks at 99% completed

Post by tdewin »

You could try to refresh the frame by pushing F5 or reopen the console. if the issue persists, please open a call with our support team
omfk
Expert
Posts: 110
Liked: 9 times
Joined: Nov 30, 2016 9:48 pm
Full Name: Frank Knappe
Contact:

Re: Job stucks at 99% completed

Post by omfk »

F5 settled the problem. I was under the impression that selecting a different View (Running -> Success) would already trigger a refresh of the frame.

BR
Frank
Post Reply

Who is online

Users browsing this forum: Bing [Bot] and 70 guests