-
- Expert
- Posts: 201
- Liked: 45 times
- Joined: Dec 22, 2009 9:00 pm
- Full Name: Stephen Frost
- Contact:
Re: Help! How can execute jobs in sequence?
Gostev, it would be so much easier for us users if you would:
(1) allow backup jobs to be placed into folders; and
(2) allow folders to be scheduled as well, instead of just jobs
That way it would be child's play to set up and manage. What are the chances of a feature like this?
(1) allow backup jobs to be placed into folders; and
(2) allow folders to be scheduled as well, instead of just jobs
That way it would be child's play to set up and manage. What are the chances of a feature like this?
-
- Chief Product Officer
- Posts: 31816
- Liked: 7302 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Help! How can execute jobs in sequence?
The chances are close to zero, since v6 automatically manages optimal job concurrency.
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Jul 07, 2017 11:30 am
- Full Name: Javed Mansuri
Re: Help! How can execute 7 job in sequence?
Hey can you please tell me if i set the job in every 40 min then what is would affect and i did something what you said but not impressive with that.neo_italy wrote:Hi,
i wanna serialize some jobs with a batch dos script and i want check the exit status of a job before starting the following.
What is the variable that i've to check? Perhaps %ERRORLEVEL%?
Thanks
Thanks in advance
-
- Product Manager
- Posts: 5797
- Liked: 1215 times
- Joined: Jul 15, 2013 11:09 am
- Full Name: Niels Engelen
- Contact:
Re: Help! How can execute jobs in sequence?
Hi Javed,
As this is an older thread, could you tell me what you are looking for exactly?
As this is an older thread, could you tell me what you are looking for exactly?
Personal blog: https://foonet.be
GitHub: https://github.com/nielsengelen
GitHub: https://github.com/nielsengelen
-
- Influencer
- Posts: 20
- Liked: 1 time
- Joined: Aug 21, 2017 7:32 am
- Full Name: Roderick Stoner
- Contact:
Re: Help! How can execute jobs in sequence?
To run a job after another, Veeam 9.5 has this option in the Schedule tab of the job. You can select the "Run the Job Automatically" then select "After this job" and select the job from the drop down menu.
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Help! How can execute jobs in sequence?
Hi Roderick, just keep in mind that job chaining is not considered as best practice, in most cases it is recommended to start the jobs with short intervals and let automatic resource planning do it's job.
Who is online
Users browsing this forum: Semrush [Bot] and 90 guests