Discussions related to exporting backups to tape and backing up directly to tape.
Post Reply
Reklov
Expert
Posts: 101
Liked: 4 times
Joined: Aug 28, 2014 12:16 pm
Contact:

Rev. Incrementel vs. Incremental vs. Tapecopyjob

Post by Reklov »

Hi Folks,

I'm a bit in trouble.

I had changed a backupjobsetting from reverse incremental to incremental. I decided to create a synthetic full every friday.
All looks fine. The backup was much faster and my Exchange DAG has more time for maintenance.

The retention was set to 60 days.

The backupjob have a secondary destination ( Tapejob ).

What I had not think about was, that all the .vbk's will backuped to tape and not only one ( with reverse incremental ). The capacity by my Tape ( 5.5 TB ) are reached.

I like copy only the last .vbk to Tape and not all available.
What can I do to solve this ? Must I remove all old .vbk's ( breaking the backupchain ) or do I have an other choice ?

Thanks for your thoughts
Regards
Volker
veremin
Product Manager
Posts: 20282
Liked: 2257 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Rev. Incrementel vs. Incremental vs. Tapecopyjob

Post by veremin »

You should enable "process latest full backup chain only" checkbox. Thanks.
Reklov
Expert
Posts: 101
Liked: 4 times
Joined: Aug 28, 2014 12:16 pm
Contact:

Re: Rev. Incrementel vs. Incremental vs. Tapecopyjob

Post by Reklov »

Great, thanks !

In case, I will turn back to incremental with no synthetic full, will the tapecopyjob create a new full out of the last full plus the increments or will it take just the last full without the increments ?

Regards
Volker
veremin
Product Manager
Posts: 20282
Liked: 2257 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Rev. Incrementel vs. Incremental vs. Tapecopyjob

Post by veremin »

In case, I will turn back to incremental with no synthetic full, will the tapecopyjob create a new full out of the last full plus the increments
It will create a virtual full backup in accordance with the specified schedule. Typically the latest available restore point will be used as a source for virtual full backup. Thanks.
Post Reply

Who is online

Users browsing this forum: No registered users and 16 guests