-
- Enthusiast
- Posts: 30
- Liked: 2 times
- Joined: Nov 07, 2012 8:13 pm
- Contact:
Daylight Saving Time switch causes jobs to be skipped
I had two jobs scheduled to start at 2:00AM on Sunday morning - same time as the switch to DST. Neither job ran and there was nothing in the logs about any errors or skipped jobs. Looks like B&R needs some logic to deal with this, or maybe a warning not to start jobs at 2:00AM.
Geoff
Geoff
-
- VP, Product Management
- Posts: 27377
- Liked: 2800 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: Daylight Saving Time switch causes jobs to be skipped
When did the switch happen, at midnight? Do you use remote or local SQL Server?
-
- Enthusiast
- Posts: 30
- Liked: 2 times
- Joined: Nov 07, 2012 8:13 pm
- Contact:
Re: Daylight Saving Time switch causes jobs to be skipped
Local SQL server.
The switch happens in the US at 2:00AM local time, so a job scheduled to run at 2:00AM when the time instantly changes to 3:00AM gets skipped. And I guess that would hold true for any job that's scheduled in the 2:00AM - %RetryTime% (30 minutes?) interval as the clock would have already moved past the retry time. So not only the 2:00AM jobs would be missed, but anything in that grace period. I suppose the easy fix is to change the start time to 1:59AM.
The switch happens in the US at 2:00AM local time, so a job scheduled to run at 2:00AM when the time instantly changes to 3:00AM gets skipped. And I guess that would hold true for any job that's scheduled in the 2:00AM - %RetryTime% (30 minutes?) interval as the clock would have already moved past the retry time. So not only the 2:00AM jobs would be missed, but anything in that grace period. I suppose the easy fix is to change the start time to 1:59AM.
-
- VP, Product Management
- Posts: 27377
- Liked: 2800 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: Daylight Saving Time switch causes jobs to be skipped
Yes, you're correct. I guess any Windows activity would be skipped when the switch adds plus 1 hour to the current time. The workaround should do the trick. Thanks!
-
- Service Provider
- Posts: 3
- Liked: 2 times
- Joined: Jan 22, 2018 11:43 am
- Full Name: GiEffe
- Contact:
[MERGED] When time change.... switch to summer time and vice
Hello everybody,
i've a question about switch to summer time and viceversa in cosideration of backup job.
We've a lot of scheduled job from 02:00 to 3:00 everyday, and others in another times.
Well, on 26th March, i check my job report and all jobs of 25th March from 02:00 to 02:59 are not running.
Why?
After few minutes and a lot of terrible scenario, an idea: maybe the question is the switch to summer time?
Yes, of course, easy.
Unfortunately it's no easy explain to my boss why there aren't backup of that machines on 25th of March.
And when switch to winter time?
A double backup of vm's?
Yes, i think: that's better of other switch time.
But, it's possible made something without remember when change time from summer and winter time, then manually change time of job's?
Bye
Gabriele
i've a question about switch to summer time and viceversa in cosideration of backup job.
We've a lot of scheduled job from 02:00 to 3:00 everyday, and others in another times.
Well, on 26th March, i check my job report and all jobs of 25th March from 02:00 to 02:59 are not running.
Why?
After few minutes and a lot of terrible scenario, an idea: maybe the question is the switch to summer time?
Yes, of course, easy.
Unfortunately it's no easy explain to my boss why there aren't backup of that machines on 25th of March.
And when switch to winter time?
A double backup of vm's?
Yes, i think: that's better of other switch time.
But, it's possible made something without remember when change time from summer and winter time, then manually change time of job's?
Bye
Gabriele
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Daylight Saving Time switch causes jobs to be skipped
Hi Gabriele, just schedule the job a minute earlier, and it will not be skipped (nor executed twice).
-
- Service Provider
- Posts: 3
- Liked: 2 times
- Joined: Jan 22, 2018 11:43 am
- Full Name: GiEffe
- Contact:
Re: Daylight Saving Time switch causes jobs to be skipped
Hi foggy, yes of course, this resolve one job but if it's necessary execute a backup at 02:30?
And if this selection is not a my decision but, for example, a user from Enterprise manager want configure a backup at 02:15 with full backup on sunday because the load of vm's it's tiny?
:/
And if this selection is not a my decision but, for example, a user from Enterprise manager want configure a backup at 02:15 with full backup on sunday because the load of vm's it's tiny?
:/
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Daylight Saving Time switch causes jobs to be skipped
Currently the product doesn't have a logic to detect daylight saving time switch. Let's consider this a feature request.
Who is online
Users browsing this forum: Baidu [Spider], Google [Bot], Regnor and 62 guests