Comprehensive data protection for all workloads
Post Reply
mdiver
Veeam Legend
Posts: 201
Liked: 33 times
Joined: Nov 04, 2009 2:08 pm
Location: Heidelberg, Germany
Contact:

Feature request: notify on stuck merges

Post by mdiver »

We've seen it not only once that merges of FF jobs got stuck for some reason.
Could be poor repo design of course... :oops:

But could also be a bug like the one impacting merges on SOBRs in performance mode in 9.5 U4a. This is fixed by fix 168898 or also U4b.

Problem: we had a large SAP job merging for 100+h.
Result: no backup :( , no warning about any failure, and even worse no truncation of Oracle logs filling the log LUNs to the max. :cry:

Feature request: notification email when job hits his next scheduled window while still merging (Maybe even running at all, because this I would also consider an issue).

Or did I miss a way to get that already? Termination windows won't work, as the job could not be stopped from Veeam any more. Not even non-graceful.

Thanks,
Michael
veremin
Product Manager
Posts: 20284
Liked: 2258 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Feature request: notify on stuck merges

Post by veremin »

Do you have Veeam ONE deployed? If so, you can get a notification, if job is running longer than expected (user defined time period). Thanks!
Post Reply

Who is online

Users browsing this forum: Google [Bot] and 65 guests