-
- Enthusiast
- Posts: 55
- Liked: never
- Joined: Sep 23, 2010 2:36 pm
- Full Name: George Kenny
- Contact:
Two job schedule clashing
Hi all, very simply.
I have two jobs - the first is my key servers which runs every hour incrmental
The second is my lower servers which runs per day @ midnight.
Using the schedule options, I cannot postpone my FIRST backup, so during the morning period, I can see both jobs trying to run and what looks like contention between the two.
My question is - can veeam run two jobs at once - if so does this affect their performance (I thought not?)
Any secondly, if not - is there a way to engineer the backups to the first backup doesnt clash with the less important second backup.
Egro.
I have two jobs - the first is my key servers which runs every hour incrmental
The second is my lower servers which runs per day @ midnight.
Using the schedule options, I cannot postpone my FIRST backup, so during the morning period, I can see both jobs trying to run and what looks like contention between the two.
My question is - can veeam run two jobs at once - if so does this affect their performance (I thought not?)
Any secondly, if not - is there a way to engineer the backups to the first backup doesnt clash with the less important second backup.
Egro.
-
- Chief Product Officer
- Posts: 31836
- Liked: 7328 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Two job schedule clashing
Hi, sure, most of our customers run more than one job in parallel. That is no problem. Thanks.
-
- Veteran
- Posts: 391
- Liked: 39 times
- Joined: Jun 08, 2010 2:01 pm
- Full Name: Joerg Riether
- Contact:
Re: Two job schedule clashing
Hi,
you can easily run multiple jobs at once as Anton mentioned earlier. The performance mainly depends on the cores in your veeam system.
best regards,
Joerg
you can easily run multiple jobs at once as Anton mentioned earlier. The performance mainly depends on the cores in your veeam system.
best regards,
Joerg
-
- Veeam Software
- Posts: 481
- Liked: 57 times
- Joined: Jun 16, 2009 1:23 pm
- Full Name: Rich Brambley
- Contact:
Re: Two job schedule clashing
Another consideration is where the VMs of each job live. In other words, when the jobs clash, are 2 or more VMs being backed up on the same datastore(s)? If so, you have 2 snapshots being created and then committed on the same LUN. This could be a IO problem with ESX or your storage device, depending on your hardware, and wrongly appear as a Veeam performance issue. You can rearrange your VMs via SVMotion, etc to prevent this.
Otherwise, as previously mentioned, Veeam can run as many jobs simultaneously as you need assuming the server hardware can handle it.
Otherwise, as previously mentioned, Veeam can run as many jobs simultaneously as you need assuming the server hardware can handle it.
-
- Chief Product Officer
- Posts: 31836
- Liked: 7328 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Two job schedule clashing
Rich is correct, and also similar considerations for target storage as well, running too many concurrent jobs pointing at the same target may cause target saturation, and this will result in random errors. I did not point this out originally because you said you only have 2 jobs anyway.
-
- Lurker
- Posts: 1
- Liked: never
- Joined: Sep 01, 2011 6:54 pm
- Contact:
Re: Two job schedule clashing
Sorry to bring up a old thread but I tried to do two different veeam jobs such as a backup and replicaton. I tried to do a replication to my other site and have a backup running of the same virtual machine. One would fail because it states the file is being in used, most likely by the other job. I don't know if this thread was meant for this setup but I was curious to see if people have successfully done this. thank you.
-
- VP, Product Management
- Posts: 27405
- Liked: 2806 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: Two job schedule clashing
Hello,
Running backup/replication jobs against the same VM at the same time is not possible currently, however you will be able to do that with VB&R v6 (Q4).
Thanks.
Running backup/replication jobs against the same VM at the same time is not possible currently, however you will be able to do that with VB&R v6 (Q4).
Thanks.
Who is online
Users browsing this forum: No registered users and 50 guests