on a 7 day retention JOB, I performed an infinite incremental backup several times.
It generated a new manual incremental several times for the same day.
I believe that he should replace the same diary keeping only one of the day, but he generated several for the same day at different times.
If I had selected instead of 7 days, 7 recovery point I understand that for each backup performed it would have to make a new one regardless of the day and perform the merge when reaching the 7 recovery point.
Now I have several recovery points from the same day and I need to perform the removal to free up space.
What should I do?
Thank you.

