Hello,
I am struggling with the configuration of a new GFS tape job. The source jobs contain among other also a Hyper-V backup copy job. This backup copy job is configured for immediate copy mode.
Now after doing some tests I’ve noticed that the restore points of this particular backup copy job were not stored on tape although new restore points appear during the tape job.
The tape job is scheduled to run daily at 2 am no not to process the most recent restore point instead of waiting.
So, what’s the trick with it?
In addition I am confused with the GFS job concept, perhaps someone can clarify this:
- What’s exactly happen on the scheduled time?
- I’ve noticed that the tape job stopped at midnight instead of running whole day, is that right?
My source jobs are running between 6 pm and midnight, how should I configure the tape job to achieve my needs to have a daily increment and a weekly full on Saturday?
Thanks!
-
- Expert
- Posts: 222
- Liked: 13 times
- Joined: Feb 19, 2013 8:08 am
- Full Name: RH
- Location: Germany
- Contact:
-
- Expert
- Posts: 222
- Liked: 13 times
- Joined: Feb 19, 2013 8:08 am
- Full Name: RH
- Location: Germany
- Contact:
Re: GFS Tape Backup and Backup Copy
Good morning,
after doing some tests I think I’ve worked it out how to do it. I’ve changed the following settings:
- Weekly full backup on Sunday instead of Saturday
- Enabling of „ Process the most recent restore point instead of waiting“
Now, the tape job starts on Sunday 2 am with the weekly backup and picks the most recent restore point of Saturday evening, even the backup copy restore points. Is the the recommended way for my needs?
What happens if the tape job is still running when the source job is starting? I’ve enabled that the tap job may not be interrupted but what happens to the selection of the restore point? When does the job defines which restore point will be use, at the time when the job starts (so 2am in my case)? I have to avoid that the weekly full consists a mix of restore points from Saturday and Sunday.
after doing some tests I think I’ve worked it out how to do it. I’ve changed the following settings:
- Weekly full backup on Sunday instead of Saturday
- Enabling of „ Process the most recent restore point instead of waiting“
Now, the tape job starts on Sunday 2 am with the weekly backup and picks the most recent restore point of Saturday evening, even the backup copy restore points. Is the the recommended way for my needs?
What happens if the tape job is still running when the source job is starting? I’ve enabled that the tap job may not be interrupted but what happens to the selection of the restore point? When does the job defines which restore point will be use, at the time when the job starts (so 2am in my case)? I have to avoid that the weekly full consists a mix of restore points from Saturday and Sunday.
-
- Product Manager
- Posts: 14816
- Liked: 1771 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: GFS Tape Backup and Backup Copy
Hi RH!
Can you please confirm that restore points created by backup copy are not GFS? Can you check the Home > Backup > Tape node for the restore points available on tape?This backup copy job is configured for immediate copy mode. Now after doing some tests I’ve noticed that the restore points of this particular backup copy job were not stored on tape although new restore points appear during the tape job.
GFS tape job starts to wait for new restore points to appear till the day is over.- What’s exactly happen on the scheduled time?
Yup, that's correct. GFS tape job restarts at the end of he day to start the new daily backup cycle, it should now await for new restore points for the new day.I’ve noticed that the tape job stopped at midnight instead of running whole day, is that right?
Sounds ok, just keep in mind that on tape you will get restore points with one day delay.Now, the tape job starts on Sunday 2 am with the weekly backup and picks the most recent restore point of Saturday evening, even the backup copy restore points. Is the the recommended way for my needs?
When 'prevent this job from being interrupted' option is selected, the source job will wait until the tape job finishes.What happens if the tape job is still running when the source job is starting? I’ve enabled that the tap job may not be interrupted but what happens to the selection of the restore point? When does the job defines which restore point will be use, at the time when the job starts (so 2am in my case)?
With 'process the most recent restore point' check box GFS tape job will use any available restore point on disk, without waiting for new backups files to appear. Based on your current setup - worst case scenario you get full backup from Friday restore point instead (or earlier), but not from Saturday.I have to avoid that the weekly full consists a mix of restore points from Saturday and Sunday.
-
- Expert
- Posts: 222
- Liked: 13 times
- Joined: Feb 19, 2013 8:08 am
- Full Name: RH
- Location: Germany
- Contact:
Re: GFS Tape Backup and Backup Copy
Hi Dima,
after changing the job settings to pick the most recent restore point it seems to be fine, so I can’t provide more information about the issue I had before.
But just to clarify my new settings and the selection of restore points:
Let’s say the tape job starts on 2 am on Sunday and it processes the most recent restore points, which restore points will be selected if...
- the source job started on Saturday but is still running? (Does the tape job wait until it’s finished?)
- a new restore point will be available at 6 am of a source job which is not already processed by the running tape job.
Thanks!
after changing the job settings to pick the most recent restore point it seems to be fine, so I can’t provide more information about the issue I had before.
But just to clarify my new settings and the selection of restore points:
Let’s say the tape job starts on 2 am on Sunday and it processes the most recent restore points, which restore points will be selected if...
- the source job started on Saturday but is still running? (Does the tape job wait until it’s finished?)
- a new restore point will be available at 6 am of a source job which is not already processed by the running tape job.
Thanks!
-
- Product Manager
- Posts: 14816
- Liked: 1771 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: GFS Tape Backup and Backup Copy
Hi RH,
Some cases/limitations described here: How GFS Backup to Tape Works.
Yup, it will await for new restore point creation.- the source job started on Saturday but is still running? (Does the tape job wait until it’s finished?)
Will tape out this available restore point.- a new restore point will be available at 6 am of a source job which is not already processed by the running tape job.
Some cases/limitations described here: How GFS Backup to Tape Works.
Who is online
Users browsing this forum: No registered users and 86 guests