Hello,
I have the following situation in which I don't know if GFS Tape backup jobs is gonna help me.
Currently I'm using jobs that are running once a month as then I use those full backups for tape jobs.
As this isn't suitable for our storage (lot of space is being used), we are planning to use GFS in our Daily jobs. The problem is: how can I interact tape jobs with our daily GFS Jobs?
Is there any way I can configure media pools in order to tell them only to use those backups with the monthly tag from GFS daily jobs and not the whole chain?
I did not open a support ticket btw.
Thank you so much!
Facundo.
-
- Service Provider
- Posts: 62
- Liked: 7 times
- Joined: Jul 28, 2021 2:36 pm
- Full Name: Facundo Barisano
- Location: Argentina
- Contact:
How to interact GFS daily jobs with tape jobs
VMCE / VMCA
-
- Expert
- Posts: 164
- Liked: 57 times
- Joined: Mar 22, 2021 11:19 am
- Contact:
Re: How to interact GFS daily jobs with tape jobs
Hi Facundo,
If I got this right, you want only your monthly backups that are configured with a GFS policy to be written to tape media pools? Is that the goal?
Thanks.
Could you please elaborate on that? What exactly do you mean by interaction in this case?The problem is: how can I interact tape jobs with our daily GFS Jobs?
If I got this right, you want only your monthly backups that are configured with a GFS policy to be written to tape media pools? Is that the goal?
Thanks.
-
- Service Provider
- Posts: 62
- Liked: 7 times
- Joined: Jul 28, 2021 2:36 pm
- Full Name: Facundo Barisano
- Location: Argentina
- Contact:
Re: How to interact GFS daily jobs with tape jobs
Hello nikolaj, thank you for your reply.
Yes, basically what I want to understand is if there is a way I can configure media pools or tape jobs in order to process only those monthly full backups that are configured with the GFS policy in my daily jobs. I don't know if this can be done with GFS Media Pools, but from what I've read I think it's not possible at all.
Yes, basically what I want to understand is if there is a way I can configure media pools or tape jobs in order to process only those monthly full backups that are configured with the GFS policy in my daily jobs. I don't know if this can be done with GFS Media Pools, but from what I've read I think it's not possible at all.
VMCE / VMCA
-
- Expert
- Posts: 164
- Liked: 57 times
- Joined: Mar 22, 2021 11:19 am
- Contact:
Re: How to interact GFS daily jobs with tape jobs
Hi Facundo,
The way you envisioned it is not going to work, but that's ok. What you ultimately need is to have backups from a specific date to be present on the tape.
So what you could do instead is set up a tape job to a GFS pool on certain dates (if you need them to be once a month, just start a monthly media set) and then that tape job will automatically build a synthetic full backup based on the desired date and transfer them from the repo.
I hope this helps.
The way you envisioned it is not going to work, but that's ok. What you ultimately need is to have backups from a specific date to be present on the tape.
So what you could do instead is set up a tape job to a GFS pool on certain dates (if you need them to be once a month, just start a monthly media set) and then that tape job will automatically build a synthetic full backup based on the desired date and transfer them from the repo.
I hope this helps.
Who is online
Users browsing this forum: Amazon [Bot] and 113 guests