Discussions related to exporting backups to tape and backing up directly to tape.
Post Reply
lowlander
Service Provider
Posts: 452
Liked: 30 times
Joined: Dec 28, 2014 11:48 am
Location: The Netherlands
Contact:

weekly and monthly tape out

Post by lowlander »

Hi,

we are running backup jobs everyday copying it to a copy repository resulting in 100 TiB.

running a weekly tape out will result in a tape job running for 4 days

weekly we start on saterday, monthly ew start on sunday.

running monthly tapeout we suspect an issue with time out with the weekly on saterday.

What would be a best practice to overcome these issues ?
Mildur
Product Manager
Posts: 8735
Liked: 2296 times
Joined: May 13, 2017 4:51 pm
Full Name: Fabian K.
Location: Switzerland
Contact:

Re: weekly and monthly tape out

Post by Mildur »

If you use a GFS Media Pool, Veeam should automatically wait or at least retry the monthly tape the next time the tape job will be started.
But If I were you, I would configure a GFS Pool for weekly and monthly on the same weekday.
No one needs a weekly and a monthly tape from the same weekend with the same data :) If you configure both for Saturday, veeam will automatically "promote" the weekly Tape to a monthly Tape.

Second, If you have issues with tape throughput, you could look into a tape library with multiple drives for parallel processing of the "backup to Tape"-Job.
What type is your Drive? LTO?
There is also a possibility to optimise. Higher LTO Drives will have faster write speed.
Product Management Analyst @ Veeam Software
Post Reply

Who is online

Users browsing this forum: No registered users and 8 guests