Hello all,
I have an issue with B&R v6 with only one VM (Exchange with 3 vmdks). The job starts normally (good speed) for the 2 first vmdks, and then starts the backup of the third vmdk normally before being slowed dramatically and seems to be stuck.
For information I've another job to replicate the same VM which has no pb. The 2 jobs don't work at the same time
Everything seems to be OK on the vmware side (no network, cpu or vram bottleneck).
Any idea?
Thanks for your help.
Regards
-
- Influencer
- Posts: 21
- Liked: 1 time
- Joined: Jan 25, 2011 2:08 pm
- Full Name: Frederic BROUSSEY
- Contact:
-
- Influencer
- Posts: 21
- Liked: 1 time
- Joined: Jan 25, 2011 2:08 pm
- Full Name: Frederic BROUSSEY
- Contact:
Re: Backup Job Starts fast then slowed dramatically
I checked the logs of this job and there is the following error: "There was no finalized server sessions during the last 60 minutes" and then WARN|CDiskLibContext::WaitAllDisksClosed() timeout occured.
Very strange , any idea? Should I open a case?
Thanks.
Very strange , any idea? Should I open a case?
Thanks.
-
- VP, Product Management
- Posts: 27377
- Liked: 2800 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: Backup Job Starts fast then slowed dramatically
Looks like there is some sort of connectivity issue, though I'm not sure why it occurs for the 3rd disk only. Debug logs should definitely help to pinpoint the reason for that.
Who is online
Users browsing this forum: No registered users and 53 guests