Host-based backup of VMware vSphere VMs.
Post Reply
fbroussey
Influencer
Posts: 21
Liked: 1 time
Joined: Jan 25, 2011 2:08 pm
Full Name: Frederic BROUSSEY
Contact:

Backup Job Starts fast then slowed dramatically

Post by fbroussey »

Hello all,

I have an issue with B&R v6 with only one VM (Exchange with 3 vmdks). The job starts normally (good speed) for the 2 first vmdks, and then starts the backup of the third vmdk normally before being slowed dramatically and seems to be stuck.
For information I've another job to replicate the same VM which has no pb. The 2 jobs don't work at the same time :D

Everything seems to be OK on the vmware side (no network, cpu or vram bottleneck).

Any idea?

Thanks for your help.

Regards
fbroussey
Influencer
Posts: 21
Liked: 1 time
Joined: Jan 25, 2011 2:08 pm
Full Name: Frederic BROUSSEY
Contact:

Re: Backup Job Starts fast then slowed dramatically

Post by fbroussey »

I checked the logs of this job and there is the following error: "There was no finalized server sessions during the last 60 minutes" and then WARN|CDiskLibContext::WaitAllDisksClosed() timeout occured.

Very strange , any idea? Should I open a case?

Thanks.
Vitaliy S.
VP, Product Management
Posts: 27377
Liked: 2800 times
Joined: Mar 30, 2009 9:13 am
Full Name: Vitaliy Safarov
Contact:

Re: Backup Job Starts fast then slowed dramatically

Post by Vitaliy S. »

Looks like there is some sort of connectivity issue, though I'm not sure why it occurs for the 3rd disk only. Debug logs should definitely help to pinpoint the reason for that.
Post Reply

Who is online

Users browsing this forum: No registered users and 53 guests