Host-based backup of VMware vSphere VMs.
Post Reply
jmggmgb
Novice
Posts: 8
Liked: 1 time
Joined: Aug 08, 2022 4:47 pm
Full Name: Jose Miguel Garcia Gonzalvez
Contact:

When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by jmggmgb »

Veeam Case # 05585133

Hi team,
I have an issue with a BCJ called "Backup Copy Job Oracle HVA a Alcala".

I launch it in a time frame that only this BCJ is running in the Backup Server and only this BCJ is also running alone in its Baclup Proxy (backup proxy host name= CTGHVAGWB0101).

This bakcup proxy is a physical server with 24 cores (hypertheading enabled) 48 logical procesors. Its CPU usage is 1% and memory usage 2%.

When I lauch the BCJ, I see that 16 jobs appear with running state, but just one of them is "Processing" and the remaining 15 are whith the status "Waiting for backup infraestructure resources availability".

Is that norma?, shouldn't have more than a Job with processing status?.

Thanks very much.

Jose Miguel.
jorgedlcruz
Veeam Software
Posts: 1363
Liked: 615 times
Joined: Jul 17, 2015 6:54 pm
Full Name: Jorge de la Cruz
Contact:

Re: When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by jorgedlcruz »

Hello Jose Miguel,
How many concurrent tasks do you have on the source Repository, and how many on the target repository? Most likely, there will be an issue. some more info here - https://helpcenter.veeam.com/docs/backu ... ml?ver=110

Please let us know
Jorge de la Cruz
Senior Product Manager | Veeam ONE @ Veeam Software

@jorgedlcruz
https://www.jorgedelacruz.es / https://jorgedelacruz.uk
vExpert 2014-2024 / InfluxAce / Grafana Champion
jmggmgb
Novice
Posts: 8
Liked: 1 time
Joined: Aug 08, 2022 4:47 pm
Full Name: Jose Miguel Garcia Gonzalvez
Contact:

Re: When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by jmggmgb »

Hi Jorge,

In the source end, the physical server is playing the role of Backup Proxy and Repository Server and is running just a BCJ that run 16 tasks. The Backup proxy is configured to 24 "Max concurrent task" since the server has 24 cores and the Repository Server has not limited the tasks .

In the target end, the configuration is identical, a Physical server with the role of Backup Proxy and Repository Server with the same configuration that in the source.

Regards.
Jose Miguel.
jorgedlcruz
Veeam Software
Posts: 1363
Liked: 615 times
Joined: Jul 17, 2015 6:54 pm
Full Name: Jorge de la Cruz
Contact:

Re: When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by jorgedlcruz »

Hello,
Thank you for the information. Let's wait for support to see if they can spot some misconfiguration.

Seems all is good if both repos have not limits of concurrent tasks.
Jorge de la Cruz
Senior Product Manager | Veeam ONE @ Veeam Software

@jorgedlcruz
https://www.jorgedelacruz.es / https://jorgedelacruz.uk
vExpert 2014-2024 / InfluxAce / Grafana Champion
karsten123
Service Provider
Posts: 366
Liked: 82 times
Joined: Apr 03, 2019 6:53 am
Full Name: Karsten Meja
Contact:

Re: When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by karsten123 »

Do you use WAN Accelerator for transfer?
jmggmgb
Novice
Posts: 8
Liked: 1 time
Joined: Aug 08, 2022 4:47 pm
Full Name: Jose Miguel Garcia Gonzalvez
Contact:

Re: When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by jmggmgb » 1 person likes this post

Hi, yes I am using wan accelertator.

Seem that if wan accelerator is uses, it is normal this behavior:

From Veeam Documentation:
Backup copy jobs process VMs in parallel only if you transport VM data over the direct data path. If you use WAN accelerators for backup copy jobs, VMs will be processed sequentially. For more information, see Data Transport Path.

Regards and thanks by your commets.

Jose Miguel.
karsten123
Service Provider
Posts: 366
Liked: 82 times
Joined: Apr 03, 2019 6:53 am
Full Name: Karsten Meja
Contact:

Re: When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by karsten123 »

no proplemo :)
jorgedlcruz
Veeam Software
Posts: 1363
Liked: 615 times
Joined: Jul 17, 2015 6:54 pm
Full Name: Jorge de la Cruz
Contact:

Re: When I launch a BCJ tasks that spread in 16 Jobs, only one of them is active.

Post by jorgedlcruz » 1 person likes this post

Great news, I saw you already requested closing the ticket. Yes, I didn't think about the WAN accelerator, really good to keep it in mind for the future.

Thanks a lot Karsten for the tip!
Jorge de la Cruz
Senior Product Manager | Veeam ONE @ Veeam Software

@jorgedlcruz
https://www.jorgedelacruz.es / https://jorgedelacruz.uk
vExpert 2014-2024 / InfluxAce / Grafana Champion
Post Reply

Who is online

Users browsing this forum: alanboylin, Origin 2000 and 81 guests