Hello,
We have a client complain that due to SharePoint backup that on certain days continue to run during business hours, causes his users/application to have rate limit (or throttled).
To reduce the duration of SharePoint backup job, we have done the following steps:
1. Start the job earlier in the evening 6PM
2. Add 5 additional backup apps to reduce throttling
3. Verified the CPU and memory usage on the O365 server and do not see high usage
4. With version 8 there is no way in UI to control the number of threads - so unsure of what this value is in v8 and if there is a way to control this (I understand increasing this value may not necessarily help and instead increase throttle)
We checked the throttling statistics from last nights backup and the requests for each app is 600K above and throttle is in 200s - so not so much of throttle that is concerning.
We need your help to assist us with any fine tuning (example the thread count) or any other parameter that can assist with improving the performance of backup job so that it finishes between 9PM to 6AM window.
Opened a case #07795063
-
- Service Provider
- Posts: 220
- Liked: 44 times
- Joined: Apr 23, 2021 6:40 am
- Full Name: Sumeet P
- Contact:
Who is online
Users browsing this forum: david.tosoff, kipper and 12 guests