Comprehensive data protection for all workloads
Post Reply
hannisch
Enthusiast
Posts: 34
Liked: 5 times
Joined: Dec 15, 2011 8:14 pm
Full Name: Sven Hannisch
Contact:

Wrong scheduled backup job

Post by hannisch »

I have a backup job which was configured at the beginning to run on friday. A week ago I changed the job to run on sundays. But it still runs on fridays, too and under Next run the 9 th November is shown, not the 11th. It seems, the old scheduling entry is not cleaned, when reconfiguring the scheduler. I´m running 6.5.0.109 / ticketid#00153993

Sven
Gostev
Chief Product Officer
Posts: 31460
Liked: 6648 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: Wrong scheduled backup job

Post by Gostev » 1 person likes this post

Check if you possibly have full backup still scheduled to run on Friday.
hannisch
Enthusiast
Posts: 34
Liked: 5 times
Joined: Dec 15, 2011 8:14 pm
Full Name: Sven Hannisch
Contact:

Re: Wrong scheduled backup job

Post by hannisch »

This was the problem. The full syntheic job was still scheduled on friday.

Thanks a lot.
Post Reply

Who is online

Users browsing this forum: Google [Bot], Semrush [Bot] and 128 guests