Hi All,
Firstly, I'm a VEEAM Noob - be gentle! I have very limited experience in VEEAM so I'm just trying to settle a little bet internally and gain some knowledge along the way.
Scenario:
We have two datacentres that are connected via an MPLS network (routed network), each running their own ESXi hosts with their own vCentres and their own SANs.
We're decommissioning the datacentre where the virtual machines run at the moment and we need to migrate the virtual machines into the new datacentre but the vCentres won't be in linked mode at all - everything standalone from each other, including subnet.
Is it possible to migrate virtual machines, in any capacity, from one datacentre to another in this scenario? We're OK if we need turn off machines to migrate them.
We will most likely have VEEAM backup server at each location. I saw example 4 "Scaling for Production and DR Sites" in the best practice guide which looks like an option?
Thoughts?
Cheers!
-PF
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Sep 28, 2013 2:08 am
- Full Name: Pete Farmer
- Contact:
-
- Chief Product Officer
- Posts: 31816
- Liked: 7302 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Restore to Standalone vCentre
Hi Pete, and welcome to the forums. Sure, you can simple add both vCenter servers and either do backup+restore, or perform replication+failover+permanent failover, or just use the Quick Migration functionality (which is actually designed specifically for your scenario). Thanks!
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Sep 28, 2013 2:08 am
- Full Name: Pete Farmer
- Contact:
Re: Restore to Standalone vCentre
Brilliant. Thanks Gostev.
So looks like I win the bet!
Cheers!
So looks like I win the bet!
Cheers!