Host-based backup of VMware vSphere VMs.
Post Reply
leduke
Enthusiast
Posts: 76
Liked: 2 times
Joined: May 22, 2012 12:09 pm
Full Name: alex
Contact:

Job never do full backup

Post by leduke »

Hello.

I configured an incremental backup job, on a Windows Share repository.
I have two jobs with two repositories.

The first Job performe a daily incremental backup and a full backup on sunday (tranform previous full backup into rollback). The second jobs has been configured with the same settings, but the fullbackup is never performed... I have only the first fullbackup.......

Have you got an idea about the problem ?

Thank you.
foggy
Veeam Software
Posts: 21070
Liked: 2115 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Job never do full backup

Post by foggy »

So the job was started on Sunday but did not perform a full backup? Could you please give us more details on both jobs settings (including scheduling)?
Vitaliy S.
VP, Product Management
Posts: 27112
Liked: 2719 times
Joined: Mar 30, 2009 9:13 am
Full Name: Vitaliy Safarov
Contact:

Re: Job never do full backup

Post by Vitaliy S. »

leduke wrote:The second jobs has been configured with the same settings, but the fullbackup is never performed... I have only the first fullbackup.......
Seems like the second job missed it's configured schedule. The reason for that should be observed in the job session for that day. BTW, how many proxy servers do you have? And what is the max concurrent tasks value on them?
leduke
Enthusiast
Posts: 76
Liked: 2 times
Joined: May 22, 2012 12:09 pm
Full Name: alex
Contact:

Re: Job never do full backup

Post by leduke »

With your question, i checked one more time my jobs, and I found the problem:
The second Job was schedules after the first one, on the first one, the full backup was selected on Sunday, and also on the second job, but the first job withe the full backup finished on Monday at 01h00 on monday... So the second job started on monday so no full backup was selected on monday... I selected the full backup on monday for the second job and the week the full backup was performed...

It was a "schedule" mistake.

Your question give me the way to solve it.

Thank you
foggy
Veeam Software
Posts: 21070
Liked: 2115 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Job never do full backup

Post by foggy »

Dark side of the job chaining...
Post Reply

Who is online

Users browsing this forum: No registered users and 67 guests