Hello,
Base on this guide: https://helpcenter.veeam.com/docs/backu ... ml?ver=120
I am currently testing nas backup to tape.
We backup NAS shares everyday on short term server and copy them on long term server too;
we know the first backup was a full of course, and incremental for the following.
so we want to backup these nas backups on tape everyday too, of course the first will be a full backup on the tape, but as obviously we cannot use GFS for NAS backup to tape, how can periodically create full on tape ?
Below my configuration for my bacckup to tape job:
Media pool --> "abc"
Incremental Backup --> checkbox enabled with media pool --> "abc"
Eject tape media upon completion enabled
Export current media set upon job completion disabled (not checked)
Below my configuration for my Media pool "abc" :
For test, only 3 LTO8 tapes inside this media pool
Media set name : "Do not create, always continue using current media set"
Data retention policy : "Protect data for 1 Month"
Offline media tracking : Move all offline tapes.... " enabled
Enable parallel processing for tape jobs using this media pool : enabled --> 2 tape drives simultaneously
Process independent data sources simultaneously : enabled
Use encryption : enabled
Thank y ou for your help
regards
-
- Enthusiast
- Posts: 48
- Liked: 4 times
- Joined: Feb 11, 2011 2:39 pm
- Full Name: rpveeam
- Contact:
NAS backup to tape
Best regards
-
- Product Manager
- Posts: 14972
- Liked: 3159 times
- Joined: Sep 01, 2014 11:46 am
- Full Name: Hannes Kasparick
- Location: Austria
- Contact:
Re: NAS backup to tape
Hello,
Best regards,
Hannes
that can be done by scheduling a full backup in the "full backup" step (one step before the "incremental backup") in the tape job wizard.how can periodically create full on tape
Best regards,
Hannes
Who is online
Users browsing this forum: No registered users and 117 guests